30 articles on the CemPU building system, BR25 documentation, construction time, thermal bridges, facade renovation, LCA, CNC precision and ESG taxonomy. Written for architects, consulting engineers, building constructors, contractors and developers.
The knowledge hub is organised into seven thematic clusters. Each article links onwards to technical hubs and related topics — so you quickly find what you are looking for.
Documented figures, reports and compliance for BR25, the EU taxonomy and DGNB. Used directly by architects, engineers and building constructors during design.

REI 30 fire, A2 cement board, 56.8 kg CO₂e/m² (Tekment 336, low-GWP PU) and R_w 43 dB. All the documented figures with direct links to DBI and 103 ApS.
See all figures →
Everything the documentation pack must contain to comply with BR25: LCA, fire, acoustics and structural – packaged for CemPU.
See BR25 documentation →
Drying construction moisture puts a measurable load on Module A5 in the LCA account. CemPU does not absorb water — see the concrete CO₂ gain.
Understand Module A5 →
The 336 mm CemPU panel has R_w ≈ 43 dB documented by 103 ApS. How to use it correctly — and when a double build-up is required.
Read about acoustics →
Banks and investors ask about the EU taxonomy and ESG. See which documentation CemPU delivers — and how it supports your financing.
See ESG documentation →
± 1 mm CNC tolerance, 1,200 mm standard module and ready-made corner panels. How a 5-day weathertight shell becomes technically possible — not just rhetoric.
See the CNC article →Looking for the full technical documentation? → The documentation pack
Total cost of ownership, 2026 construction pricing, operating savings and CemPU as a strategic choice for developers, housing associations and private clients.

For developers and turnkey contractors: how the CemPU system reduces construction time, risk and CO₂ on your next project.
See developer arguments →
Rising construction prices put pressure on developers and private clients. See how prefab shifts costs from hours and errors to documented m² pricing.
See price comparison →
A low U-value means lower heat loss. See how it concretely affects operating costs — and how we produce a project-specific estimate.
Calculate operating savings →
For housing associations: CemPU improves operating economics across 50 years. Low heat bills, no mould, low maintenance.
See housing case →
30,000–50,000 new detached houses are expected in Denmark by 2034 (Statistics Denmark). See how CemPU makes new-build faster, greener and BR25-ready without compromising aesthetics.
Read about the detached house →From foundation to weathertight shell in five days. The big differentiator is that CemPU installation does not depend on the weather — and that changes the entire project economics.

The typical schedule from foundation to closed envelope with CemPU panels — 5 days for a detached house, documented on completed projects.
See the schedule →
Traditional detached-house construction reaches weathertight shell in week 5–7. Tekment does it in week 2. See the week-by-week comparison.
See the comparison →
Frost, rain and wind do not stop a CemPU build. See how prefab panels make winter installation as reliable as summer.
Read about winter construction →
Summer rain, autumn winds or winter frost – CemPU panels stay dry. See how weatherproof installation changes project economics.
Read about weather resistance →
Short season, complex logistics, limited workforce — CemPU is designed for arctic sites. Delivery to Greenland and the North Atlantic.
See arctic case →The three classic pain points in Danish construction — thermal bridges, mould and outdated construction methods — and how CemPU addresses them structurally rather than with patches.

Poorly detailed joints can steal up to 30% of heat loss (SBi 213). See how Tekment's corner panel solves the problem in production.
Read about thermal bridges →
Inorganic surfaces and a closed PU core mean mould and rot cannot get a foothold. This is how CemPU buildings keep a healthy indoor climate for decades.
Read about indoor climate →
Danish construction faces a paradigm shift. See how prefabricated CemPU panels solve drying times, thermal bridges and weather dependency.
Read about the paradigm shift →Architectural arguments for CemPU: free facade choice from render to fibre cement, slimmer constructions that give more daylight and more usable m² inside.

The cement surface on CemPU takes reinforced mesh render directly. Guide to Weber, Sto, Skalflex and Baumit systems with installation principle.
See render guide →
CemPU supports all common facade types: HardiePlank, Swisspearl, Cedral, EQUITONE, mesh render and timber. See the complete guide to facade choice.
See all facade types →
Slimmer walls give more usable interior m² and more daylight. A 150 m² house gains approximately 7 m² extra — documented from wall thickness.
See the m² calculation →CemPU is not only for new build. The system can be mounted on top of existing facades and on top of existing buildings — without relocating residents.

Tekment is mounted on top of existing facades — also on 1960s and 1970s buildings. New envelope without relocating residents.
See renovation case →
CemPU's low dead weight makes it relevant for vertical extensions on shopping centres, car parks and multi-storey buildings. Structural review required.
Read about vertical extension →Direct comparisons, the site team's own words, and the classic prefab myths confronted with documentation.

Direct comparison on build time, moisture, thermal bridges, CO₂ and interfaces. Documented differences between traditional and CemPU construction.
See the comparison →
Typical feedback from the site once the fitters have raised the first panel — and what makes the working day simpler.
Read site experience →
"It all looks the same", "it's expensive", "it doesn't hold up in Danish weather" — the five classic prefab myths meet documentation.
See myth check →
Ytong Ultra+ 48 cm gives U 0.15 — CemPU 336 mm gives 0.079. Lambda values, wall thickness and total economics side by side.
Read the comparison →
Detailed breakdown with 2026 pricing: blocks DKK 700–900, adhesive DKK 50–150, mason work DKK 1,200–1,600 — total DKK 2,200–2,800/m² finished wall.
See the breakdown →
Five points that set out where we stand: the system must carry the craftsmanship, CO₂ is a design parameter, time is a climate item, documentation is the product, and we build to last 50+ years.
Read the manifesto →The CemPU system covers more than residential building. The Tekment 235 panel is optimised for industrial halls, holiday homes and interior walls where the U-value requirement is lower — and where low dead weight, fast installation and a fire-safe surface are critical parameters.

Warehouses, production, sports and agricultural halls. Tekment 235 as an alternative to steel frame with sandwich panels: solid surface, no thermal bridges, A2-classified and documented REI 30.
Read about halls →
BR18 §259 requires U-value ≤ 0.20 for holiday homes — Tekment 235 delivers 0.114. Low dead weight, no mould during vacant periods and weather-independent installation.
Read about holiday homes →
Load-bearing interior walls, temperature-zone divisions, non-load-bearing partitions in halls and technical rooms. Alternative to masonry partitions and steel/gypsum construction.
Read about interior walls →