CNC precision and standard dimensions — why everything fits the first time

When the panel is cut by a CNC machine to the same tolerance as a kitchen door, and walls, windows and doors are drawn to standard dimensions from the start, everything fits together on site. No adjustment in the rain. No waste. No wrong deliveries.

CNC production of CemPU panels at the Tekment factory
± 1 mm
on edge
CNC tolerance
EN 13986
1,200
mm module
Standard width
panel
2,600/2,880
mm
Standard heights
panel
0–2%
material waste
Factory vs. site
CNC

What CNC production really means

CNC (Computer Numerical Control) is the same technology that cuts kitchen doors, car components and industrial furniture. The difference from manual installation on a construction site is not just speed — it is tolerance. A CNC machine works at ± 1 mm on a 2.6 m board. A carpenter with a hand saw in wind and rain realistically works at ± 3–5 mm.

That means when two CemPU panels meet at a joint, the gaps and steps are small enough to lie within the overall installation tolerance. No additional adjustment pieces. No joint patching.

Tekment's precision in practice

Standard dimensions: why modular thinking works

Tekment works with modular standard dimensions used by most drawing systems in Europe: 1,200 mm base module width, standard heights of 2,600 mm and 2,880 mm, and special heights up to 3,600 mm by project request.

The benefit is not just production efficiency. It is also that your architect's drawing software and our CAD system speak the same language. A panel drawn as 1,200 × 2,600 mm can be cut, transported and installed without intermediate calculations. Where it has to be 1,237 × 2,658 mm, that is also fine — but it becomes more expensive and slower.

What the architect should know

CNC + standard dimensions = a predictable construction site. Factory precision means that installation can be done quickly because everything fits the first time. That is the actual reason a 5-day weathertight shell is possible — not just that the panels are large, but that they fit.

Economic consequence

Traditional masonry/carpentry construction typically has 5–10% material waste from miscuts, adjustments and replacement of damaged components. In a CNC factory waste is at 0–2%. On a project with a 200 m² facade the difference is directly measurable — both in DKK and in CO₂, because every kilo of material has a footprint.

On top of this comes the hidden item: labour hours spent on adjustment. Every time a carpenter spends 20 minutes preparing a window dimension to fit, that is 20 minutes not spent advancing the build. Across an entire detached house we typically talk about 40–80 hours of saved adjustment time.

Sources and documentation

Note: Source documents are in Danish.

Send the drawing — we will check the dimensions

We review your drawing and report back with concrete suggestions for which panels can be standardised, and where special dimensions are optimal.

Send for dimension check