Fire – REI 30 and class A2 on the cement board
The CemPU load-bearing wall construction is documented to REI 30 (load-bearing capacity, integrity and insulation for 30 minutes) by the Danish Institute of Fire and Security Technology (DBI). The exterior, the Cetris cement particle board, is classified A2-s1, d0 according to EN 13501-1 – the highest classification for non-combustible materials. The cladding facing the PU core meets K1 10 B-s1, d0 (Class 1 cladding).
In practice, this means CemPU can be used in single-family houses, terraced houses, linked houses and semi-detached houses up to 1 storey directly from the pre-accepted solutions in BR18. For 2 storeys or multi-storey housing there are specific requirements that we clarify on a project-specific basis.
CO₂ – 56.8 kg CO₂e/m² for Tekment 336 with low-GWP PU
Our LCA client report documents a total emission of 56.8 kg CO₂e/m² for module A1–A4 (raw materials, transport, production and transport to site) for the Tekment 336 panel with low-GWP PU core. For other panel types and PU formulations the figures lie between 49 and 92 kg CO₂e/m² (A1–B6) depending on board thickness and PU type. The report is structured according to EN 15804+A2 and can be used directly by the client's LCA consultant in BR18/BR23 calculations.
The emission factors are based on the EPD for Cetris cement particle boards, supplier-based product carbon footprint (PCF) from PLIXXENT GmbH for the PU system, and EPD for stainless-steel fittings. No unsupported assumptions have been made.
Acoustics – R_w ≈ 43 dB at 336 mm
103 ApS (consulting engineer) has produced indicative calculations for the 336 mm panel (Cetris 18 mm + PU 300 mm + Cetris 18 mm). The average of two calculation methods comes to R_w ≈ 43 dB with an added safety margin of 3 dB. This covers requirements for external walls and internal walls in single-family, terraced and linked houses. For apartment separation (BR18 ≥ 55 dB) we design a double build-up.
Structural – documented by Energihuset A/S
Structural report 18.235 (Energihuset A/S) documents load-bearing capacities for CemPU panels at 2.8 m / 3.0 m / 3.6 m heights, for vertical, horizontal and combined loads. This is the basis that makes CemPU usable as a load-bearing structure in buildings up to 2 storeys.