Background, material logic and systems thinking behind Tekment's building system – from the SIP principle to a Danish, industrial building system for Nordic conditions.
Tekment is a Danish development and engineering company focused on simple, energy-efficient and verifiable building systems. We work with industrialised production of walls and roofs so that as much quality as possible is secured in the factory – and as little as possible is left to chance on the construction site.
The core idea behind CemPU is that load-bearing, insulation and surfaces are combined in a single prefabricated panel. That delivers:
The CemPU system builds on the SIP principle (Structural Insulated Panels): an insulating core sandwiched between two strong facings. The idea is simple, but the history behind it is long.
In the 1930s the first sandwich panels are developed for, among other things, aircraft and special constructions. Two strong facings with a light core in between provide high strength, low weight and good stiffness.
In the 1950s the sandwich principle is translated into actual Structural Insulated Panels. The panels are used as load-bearing, insulating walls and roofs, typically built from timber boards and a light insulation core.
The oil crises and stricter energy requirements make insulation and airtightness a focus area. Modern foam types such as EPS and PUR begin to be used in the panels, and SIP systems become a real alternative to traditional construction – especially in North America.
During the 1990s and 2000s the use of SIP systems grows in several European countries. They are used in particular in low-energy houses, modular construction and prefabricated concepts, where short build time and high energy performance are central requirements.
In Denmark the SIP principle becomes genuinely relevant alongside stricter energy requirements and greater focus on CO₂, LCA and industrialised construction. Tekment is among the companies further developing the SIP idea for Danish conditions through the CemPU system: inorganic cement-based facings, a PUR core with low thermal conductivity, precise joints that minimise thermal bridges, and industrial production with documented properties.
Where classic SIP solutions are often based on timber boards, CemPU is developed for Nordic conditions with a focus on robustness, fire and moisture. The system combines:
The result is slim walls, short build time and a high level of documentation – without compromising on either comfort or architecture.
Tekment's CemPU system is developed with the full life cycle in mind – from production through operation and later conversion or refurbishment. We continuously work on data for LCA and EPDs so that consultants, contractors and developers can document their projects.
In this way Tekment combines nearly 100 years of technological development in sandwich and SIP construction with a Danish, practice-oriented approach to modern building.
A short overview of the company and contact details.
| Established | 2018 |
|---|---|
| VAT/CVR | DK39406373 |
| Factory | Bakkevej 19, 5750 Ringe, Denmark |
| info@tekment.dk | |
| Market area | Denmark, Nordic countries, Greenland and Northern Germany |
| Primary audience | Architects, consulting engineers, contractors, developers |