The building system

CemPU – one panel, three functions.

CemPU panels are prefabricated sandwich panels that combine the load-bearing structure, PU insulation and a cement-based envelope in a single thermal-bridge-free module. Factory-made, fully documented on every parameter.

CemPU sandwich panels installed on a construction site Completed CemPU house with thermal-bridge-free building envelope and timber-clad facade
Construction

How a CemPU panel is built

Three layers working together: two cement-based facings hold a high-performance PUR core. The result is a strong, slim and thermal-bridge-free wall.

1 · Exterior cement board (18 mm) Inorganic envelope. Withstands weather, moisture and heavy use. Ready for render finishes or ventilated facade.
2 · PUR insulation core (up to 300 mm) Lambda 0.023 W/mK. High-performance polyurethane with very low thermal conductivity. Provides stiffness and transfers loads between the facings.
3 · Interior cement board (18 mm) Load-bearing facing ready for interior finish – paint, tiling, render or cladding.
4 · Thermal-bridge-free joints Precise, industrially manufactured joints and corner panels that eliminate the thermal bridges common in traditional construction.

Why sandwich?

The SIP principle (Structural Insulated Panels) has been known from aircraft and shipbuilding since the 1930s: two strong facings that share loads through a light, insulating core. The result is very low weight relative to strength.

CemPU is the Nordic evolution: cement-based facings instead of timber, making the panel inorganic, moisture-resistant and fire-resistant – adapted to stringent Danish energy and fire requirements.

Read the full SIP story
Specifications

Technical properties

Documented, measured values – not marketing claims. The full documentation pack is on the documentation page.

U-value (300 mm)0.079 W/m²K
Lambda value (PUR core)0.023 W/mK
Fire classificationREI 30 (DBI-tested)
Sound reduction (Rw)42–48 dB depending on build-up
Wall thicknesses200 and 300 mm
Max. panel sizeHeight up to 3.6 m · Width up to 12 m
Load-bearing structureSandwich – loads distributed across both facings
SurfacesCement-based board, ready for render or cladding
CO₂ reductionUp to 40% vs. traditional concrete construction
CE markingDocumented in accordance with EN 14509 and ETA approval
Benefits

What does it mean in practice?

Three measurable differences when CemPU is compared with traditional construction.

⏱

Shorter build time

Weathertight shell typically in 5–11 days depending on size. No wet trades, no drying phase before interior works.

📐

Slimmer construction

High insulation performance in a small thickness yields up to 5–8% more interior floor area compared with traditional build-ups.

✓

Fewer sources of error

Quality is set in the factory. The site handles installation – not insulation, vapour barrier and board joints.

See it in practice

Video, photos and installation guide

How does CemPU look from delivery to finished wall? Watch the assembly video, see site photos and download the PDF guide.

Ready to use CemPU on your next project?

Send us drawings and a project brief. We will review your project and come back with proposals for panel layout and specifications.