Frequently asked questions · Tekment

What you need to know about the CemPU building system

28 concrete answers with numbers — about U-value, fire class, BR25 compliance, installation time, prices, materials and applications. Written for architects, consulting engineers, contractors and developers considering CemPU for low-energy construction, multi-storey housing, institutions, commercial or industrial halls.

Seven topic areas

Jump directly to your question

The FAQ is structured into seven topics. Each question has a 2-4 sentence answer with concrete numbers and a link to the full article.

01 · Technical questions

Technical questions

U-value, fire class, build-up and dimensions. The fundamental properties of CemPU.

What is the U-value of CemPU?

The CemPU 336 mm element has a documented U-value of 0.079 W/m²K. This is achieved at 336 mm total wall thickness with a PU core (lambda 0.023 W/mK). The Tekment 235 mm element has a U-value of 0.114 W/m²K and is typically used for halls, holiday homes and internal walls.

Read more about technical data →

What fire class does CemPU have?

CemPU is DBI-tested to REI 30 (load-bearing capacity, integrity, insulation for 30 minutes). The material classification under EN 13501-1 is A2-s1,d0 — limited contribution to fire, very low smoke development, no flaming droplets. This qualifies CemPU for multi-storey housing, institutions, commercial buildings and industrial halls.

Read more about fire class →

What does a CemPU element consist of?

A CemPU element consists of three layers: exterior cement board (18 mm), PU insulation core (up to 300 mm) and interior cement board (18 mm). The three layers are assembled at the factory into one load-bearing, insulating and moisture-resistant module with precise CNC cutting (±1 mm tolerance).

See the building system →

How thick is a CemPU wall?

CemPU 336 is delivered with a total wall thickness of 336 mm (18 + 300 + 18). Tekment 235 is delivered at 235 mm. Module width is typically 1200 mm (CNC standard module) and element height up to 3.6 m. Larger elements can be customised per project.

Read about CNC precision →
02 · Installation & build time

Installation & build time

Dry installation, short build times and what is required of the site and installation crew.

How long does it take to close the building envelope with CemPU?

A closed shell with CemPU typically takes 5–11 days depending on project size. By comparison, traditional masonry or in-situ cast concrete takes 2–4 months. The short build time is due to prefabrication, dry installation without drying time and large elements.

Build time comparison →

Do you need to be a specialist to install CemPU?

No. CemPU is installed by a small qualified crew (typically 2–4 people) with a crane and standard construction equipment. Tekment provides installation guidance and a technical mockup visit on site. No mortar, no drying time, no wet processes.

Contractor experiences →

Can CemPU be installed in winter?

Yes. CemPU has dry installation without mortar or in-situ cast concrete, so temperature is not a limiting factor. The PU core is diffusion-tight and non-hygroscopic and does not absorb moisture. At very low temperatures or strong winds installation can be paused, but the material and joints themselves are not affected.

Read about winter construction →

How many m² of wall can be installed per day?

An experienced installation crew typically installs 80–150 m² of wall per day depending on element size and complexity. That is 5–10 times faster than traditional masonry. The standard 1200 mm module width and element height up to 3.6 m mean that few elements cover large surfaces.

Fast build time →
03 · Materials & facade

Materials & facade

Which facade solutions CemPU is suited to, and what the board surface withstands.

What facade can CemPU have?

CemPU can be clad with virtually any facade solution: rendered systems, ventilated facades with fibre cement/HPL/timber/clay tile panels, ceramic tiles or directly with thin brick. The exterior cement board is a strong and stable substrate for both light and heavy cladding.

Read about facade choice →

Can CemPU be rendered directly?

Yes. The exterior cement board is specifically developed to receive render systems. Standard render systems from Sto, Weber, Mira and similar are used. This produces a monolithic facade without cladding texture — particularly suited to classical architecture and low-energy single-family houses.

Render on CemPU →

What is the board surface made of?

The cement boards are fibre cement with an inorganic matrix — primarily cement, calcium silicate and reinforcing fibres. The boards are moisture-resistant, freeze-thaw stable (CEN/TS 12390-9) and UV-stable. No organic content means no nutrition for mould or bacteria.

Material overview →

Does CemPU resist moisture and mould?

Yes. The PU core is diffusion-tight and non-hygroscopic — it does not absorb moisture. The cement boards are inorganic and offer no nutrition for mould or bacteria. The construction tolerates temperature gradients between +20 °C indoors and -40 °C outdoors without risk of condensation.

Mould-free construction →
04 · Price & economics

Price & economics

What CemPU costs per m², operating savings and total economy compared to alternative building systems.

What does a CemPU wall cost per m²?

The price depends on element size, finish and project complexity. For single-family houses and smaller projects CemPU is typically on par with or slightly above traditional masonry incl. insulation — but with significantly lower installation time and operating costs. A specific quote is provided per project within 2–5 working days.

Building prices 2026 →

How much does it save on operating costs?

At a U-value of 0.079 vs. typically 0.15–0.20 W/m²K in traditional construction, 50–60% of heat loss through walls is saved. For a 150 m² single-family house with annual heating of 12,000 kWh, this can mean 4,000–5,000 DKK/year in saved heating bills at current prices. Payback time on the additional insulation is typically 5–10 years.

Operating savings →

Is CemPU more expensive than aerated concrete (Ytong)?

Per m² of wall, CemPU is typically slightly more expensive than aerated concrete at the element itself. But when factoring in the lower installation time (5–11 days vs. 6–10 weeks), better U-value (0.079 vs. 0.15–0.18) and operating savings, the total economy is often better with CemPU.

Aerated concrete vs. CemPU →

What is the total economy compared to traditional construction?

Total cost of ownership (TCO) over a 50-year lifetime depends on the project, but typically for single-family houses: CemPU has 5–10% higher material cost but 30–40% lower labour cost, 50–60% lower operating costs and 100% lower risk of moisture/mould damage. Result: 10–20% lower TCO over lifetime.

CemPU vs. traditional →
05 · Compliance & BR25

Compliance & BR25

Building regulations, CE marking, structural documentation and EN standards.

Does CemPU comply with BR25?

Yes. CemPU 336 mm has U-value 0.079 W/m²K — comfortably below BR25's requirement of 0.18 W/m²K for exterior walls in new dwellings. Fire class A2-s1,d0 and REI 30 meet BR25's fire requirements for multi-storey housing, institutions and commercial buildings. Structural documentation under EN 1991 is delivered per project.

BR25 documentation →

Is CemPU CE marked?

Yes. CemPU is documented under EN 14509 (self-supporting sandwich panels with insulation core) and is supplied with a Declaration of Performance (DoP) and ETA basis. CE marking is recognised under BR25 in Denmark and under building regulations in other EU countries as documentation of essential properties.

See certificates →

What structural calculations are delivered?

Structural documentation is delivered per project under EN 1991 (loads) and EN 1992-1-1 (concrete) with engineer's stamp. The calculations cover snow load, wind load, dead load and fire construction (REI 30). For larger projects, ground movement and dynamic calculations are also delivered when required.

Structural design →

Is CemPU documented under EN standards?

Yes. CemPU is documented under EN 14509 (sandwich panels), EN 13501-1 (fire class), EN 1991 (loads), EN ISO 717 (acoustics) and CEN/TS 12390-9 (freeze-thaw). Life cycle assessment (LCA) is performed under EN 15804+A2 and documented at 56.8 kg CO₂e/m² for CemPU 336.

LCA documentation →
06 · Applications

Applications

Building categories where CemPU is particularly relevant — from single-family houses to industrial halls.

Can CemPU be used for single-family houses?

Yes. CemPU is ideal for single-family houses — particularly low-energy and passive house projects. The low U-value (0.079) and slim wall dimension (336 mm) provide more interior net area per m² of plot. Fast installation means the house can be ready 4–6 months from groundbreaking to move-in.

Sustainable single-family house →

Can CemPU be used for multi-storey housing?

Yes. Fire class A2-s1,d0 and REI 30 qualify CemPU for multi-storey housing up to 4 storeys under BR25. Sound insulation R'w 42–48 dB meets BR25's acoustic requirements for residential separations. Typically used for 12–60-apartment multi-storey buildings with a main contractor as driver.

Social housing →

Can CemPU be used for industrial halls?

Yes. CemPU is particularly well suited to industrial halls due to A2-s1,d0 fire class (no combustible insulation), large free spans without internal load-bearing walls, and fast installation. The inorganic surface withstands hard mechanical exposure, chemicals and cleaning agents. Used for both heated and unheated halls.

CemPU for halls →

Can CemPU be used for renovation?

Yes. CemPU is an excellent solution for energy renovation — particularly building envelope replacement on existing buildings. The low weight (typically 60 kg/m²) does not stress the foundation, and slim walls preserve as much net area as possible. Seasonal replacement of 2–6 weeks per apartment is typical.

Renovation with CemPU →
07 · Practical

Practical

Delivery area, delivery time and how to get a quote or visit the factory.

Where does Tekment deliver?

Tekment delivers primarily to Denmark from the factory in Ringe on Funen, but also to Greenland (via Royal Arctic Line), Norway, Sweden and Northern Germany. Logistics are planned as part of the project — for projects in Greenland we pack 100–150 m² of wall per 40-foot sea container.

About Tekment →

How long is the delivery time?

From order to delivery is typically 4–8 weeks depending on project size and complexity. For Greenland, logistics via Royal Arctic Line must be factored in — typically 8–12 weeks total delivery time. We recommend initiating dialogue 6–9 months before the building season to secure factory slot and shipping.

Contact for dialogue →

How do I get a quote?

Send drawings and a brief project description via the contact form — we assess the project and respond within 1–2 working days with a concrete reply. For smaller projects, an indicative budget can be given from plan and facade. For larger projects we prepare detailed element subdivision and structural sketch.

Submit project for assessment →

Can I visit the factory?

Yes. We welcome architects, consulting engineers, contractors and developers at the factory in Ringe on Funen. A factory visit gives insight into CNC production, quality control and typical details. Arrange a visit via the contact form — we coordinate the date according to your project schedule.

Arrange factory visit →

Missing an answer to a question not listed here?

Send your question or project description — we respond with a concrete technical assessment within 1–2 working days.