CemPU for halls – thermal-bridge-free envelope in days

The Tekment 235 panel is developed for buildings where the requirement is a robust envelope, fast installation and documented insulation – without over-insulating. For warehouses, production halls, sports halls and agricultural halls it is typically the right choice.

CemPU panels for halls – production and installation
0.114
W/m²K
U-value
Tekment 235
235
mm
Panel thickness
200 mm PU core
A2-s1, d0
EN 13501-1
Surface
Cetris cement board
≤ 6 m
height
Load-bearing wall
project-specific structural

When is Tekment 235 the right choice for the hall?

Tekment 235 is the thinner of the two standard panels in the CemPU system. It has a 200 mm PU core between two 13 mm Cetris cement particle boards, total thickness 235 mm. That gives a U-value of 0.114 W/m²K — lower than BR18's minimum requirement for external walls of 0.20 W/m²K and clearly below the 0.30 W/m²K threshold for buildings with limited heating per BR18 §260.

For halls this is often the right balance: heat loss is low enough that operating costs become reasonable, and the panel is at the same time lighter and cheaper per m² than Tekment 336. For housing, where BR18 §258 requires U-value ≤ 0.18 with thermal-bridge correction, 336 is always selected instead.

Four typical hall applications

Warehouses and distribution centres

The typical requirement is dry, tempered storage in the 5–18 °C range. Here U-value 0.114 yields very low operating costs, and CemPU's inorganic surface means mould and rot do not get a foothold — critical for food storage, packing and logistics. The smooth cement surface tolerates impact from forklift traffic better than sandwich panels with coated steel sheet.

Production halls

CNC workshops, metal fabrication and light production often need a controlled indoor climate and good acoustics. CemPU walls reduce reverberation and are A2-classified (non-combustible), which is relevant near hot processes, welding and painting. Internal partitions can be made in the same system to zone the production flow.

Sports halls and association buildings

For sports halls and multipurpose halls, CemPU provides a solid surface that can take ball impact directly without cracking. Acoustics can be designed with absorbent cladding outside the CemPU back wall. The system is well-suited to single-bay halls up to the load-bearing wall height, which is clarified per project from Energihuset A/S' structural report 18.235.

Agricultural halls and machine sheds

Agricultural construction requires a robust envelope that tolerates moisture, livestock and corrosive atmospheres. The cement particle board and the closed PU core remove the classic problems with rust, mould and degraded mineral-wool batts. For machine sheds and garages without a heating requirement, the 235 panel is typically the cheapest, robust choice over a cold steel hall.

CemPU 235 vs. steel sandwich panels

The real competitor to CemPU in the hall segment is not aerated concrete or masonry, but steel frame with PIR or mineral-wool sandwich panels. The comparison looks like this:

Load-bearing or in-fill hall?

Tekment 235 can be used both as a load-bearing wall in smaller halls and as an in-fill envelope in a steel or glulam structure for larger spans. Energihuset A/S has documented load-bearing capacities for panel heights of 2.8 m, 3.0 m and 3.6 m — for greater heights, or for openings of significant size, we produce a project-specific structural analysis. Wind load, snow load and combined vertical+horizontal loads are always included.

Installation – typically 2–4 days for a 200–500 m² hall

The panels are delivered prefabricated from Tekment's factory in Ringe with CNC-machined openings for doors, windows and ventilation penetrations. The installation sequence for a typical hall looks like this:

Installation is weather-independent — rain, frost or wind do not delay the work, since the panels contain no water-based materials that have to dry out.

Economics – where do the savings sit?

In hall construction with Tekment 235, the gain lies primarily not in the panel price but in build time and operating economics:

Documentation for client and consultant

For hall projects we deliver a complete documentation pack: EN 15804+A2 LCA, DBI fire report, structural report from Energihuset A/S, EPD for the Cetris board and supplier-based PCF for the PU core. It is material that you can drop directly into the building permit application and DGNB documentation without further processing.

Sources and documentation

Got a hall project?

Send the drawing or area requirements and we will produce a concrete quote with quantity take-off and delivery schedule.

Submit project for review