Get an indicative price range in 30 seconds. Enter wall area, panel type and facade — and get a realistic estimate for the m² price, total price and build time for your project.
Enter your project's figures in the form on the left, and the price estimate will appear here.
Indicative price ranges for the external wall construction alone – prefab panels ex factory or built-up constructions incl. masonry work on site. Transport, foundation, roof, windows, installation and facade cladding are not included. Ranges based on typical Danish construction prices in 2026.
Construction costs in Denmark have risen 20–25% from 2021 to Q4 2025. The rate of increase varies significantly between trades and from month to month — and it directly affects what you pay for a finished wall.
The calculator gives an indicative range for the CemPU panels themselves, corners and splines – delivered to the site. It does not include the foundation, installation, roof, windows, the facade cladding's material cost or interior fit-out.
Prefabricated CemPU wall panels, corner solutions, splines/joint solutions, CNC machining, quality control and delivery.
Foundation, roof, windows/doors, installation work, scaffolding, technical installations, interior finishing and facade cladding.
Send us your drawing, and we will prepare a precise quote with detailed quantity take-off, structural conditions and delivery logistics.