Low energy use in settlements
Slim walls with U-value down to 0.079 W/m²K. Meets BR2006's tightened requirements for the building envelope — decisive operating economics in settlements with expensive heating oil and high electricity tariffs.
CemPU is prefabricated cement/PU sandwich elements that combine load-bearing, insulation and building envelope in one. Fire class A2-s1,d0 opens the doors to multi-storey housing, institutions, commercial and industrial halls — delivered in containers via Royal Arctic Line, installed in the short arctic building season.
Short season. Complex logistics.
Limited workforce.
CemPU is designed for exactly that:
Industrial prefab delivers measurable results — not craftsmanship that has to come together on a building site with a 4–5 month season, complex logistics and limited skilled labour.
Slim walls with U-value down to 0.079 W/m²K. Meets BR2006's tightened requirements for the building envelope — decisive operating economics in settlements with expensive heating oil and high electricity tariffs.
Fire class A2-s1,d0 (EN 13501-1) approves CemPU for multi-storey housing, institutions, commercial buildings and industrial halls — not just single-family houses to which typical steel panels with PIR/PUR foam (B/C class) are limited.
100–150 m² of wall per 40-foot sea container. Packed at the factory in Ringe and shipped via Aalborg/Aarhus with Royal Arctic Line to Nuuk and coastal towns. Fewer links, less transport damage, better installation window.
Large prefab elements, dry installation and fewer work stages. The building envelope is closed in days rather than months — critical with a 4–5 month building season (May–September).
CemPU is a prefabricated sandwich element based on the SIP principle — developed further for arctic conditions. Load-bearing, insulation and surface combined in one module at the factory, so quality doesn't depend on the weather on a Greenlandic building site.
The result is a wall with precise joints, no thermal bridges in the construction and documented properties for strength, fire (A2-s1,d0), energy and freeze-thaw — tested under CEN/TS 12390-9.
See the building system in detailA2 fire classification, short installation time and container logistics make CemPU particularly relevant for three project types in Greenland.
BR2006 is set by Naalakkersuisut and imposes stricter requirements for energy frame, snow load, wind load, fire and moisture engineering adapted to arctic climate. CemPU is supplied with documentation that directly addresses the relevant sections.
Documented U-value down to 0.079 W/m²K. Comfortably below BR2006's tightened requirements — critical operating economics in settlements with expensive heating oil.
Dimensioned per project according to zone-specific loads: snow load 2.5–4.0 kN/m² and wind speeds up to 55+ m/s. Structural design to EN 1991, stamped documentation.
The PU core is diffusion-tight and non-hygroscopic; the cement skin tested under CEN/TS 12390-9. Withstands temperature gradients between indoor climate and -40 °C without condensation.
Classified A2-s1,d0 (limited contribution to fire) and meets acoustic requirements for housing and institutions (R'w 42–48 dB). Full documentation on the documentation page.
Direct comparison on the parameters that determine project viability in Greenland: fire, U-value, installation time and logistics.
| Parameter | CemPU | Steel panels w. PIR/PUR | Traditional masonry / in-situ cast |
|---|---|---|---|
| Fire class (EN 13501-1) | A2-s1,d0 — multi-storey/institution OK | B/C — typically refused for multi-storey/institution | A1/A2 — depends on build-up |
| U-value (typical wall) | 0.079 W/m²K (300 mm) | 0.11–0.15 W/m²K | 0.15–0.25 W/m²K |
| Snow load 2.5–4.0 kN/m² | Dimensioned per project | Limited span | OK with framing |
| Freeze-thaw resistance | Tested under CEN/TS 12390-9 | Corrosion risk at bends/damage | Mortar requires +5 °C, vulnerable |
| Container delivery | 100–150 m² of wall per 40' container | Long panels — require flat-rack | Many separate deliveries |
| Installation time (envelope) | Days to a few weeks | Weeks | Months — weather- and drying-dependent |
| Local labour | Small qualified team | Small installation team | Masons, concrete workers, insulators |
In Greenland, it's not bricks that determine the schedule — it's the weather, the shipping plan and the fire class. CemPU brings the three together in one element: A2-approved for multi-storey and institution, container-packed for Royal Arctic Line, and closed building envelope before winter.
Articles on the technical and logistical questions clients and consultants ask most — from fire classification and BR2006 comparison to installation in cold weather.
Why A2-s1,d0 opens the doors to institutions and multi-storey housing in Greenland — and where PIR/PUR is typically refused.
Read article →Direct comparison of fire, U-value, weight and regulatory approval between CemPU and typical steel panels in Greenland.
Read article →Differences in energy frame, snow load and fire requirements between Danish and Greenlandic building regulations — and the consequences for design.
Read article →Container packing, shipping schedule with Royal Arctic Line and installation window. How the delivery sequence is planned.
Read article →Zone-specific loads under BR2006 and EN 1991 — typically 2.5–4.0 kN/m² and 55+ m/s in exposed areas.
Read article →Why a small thermal bridge becomes a big moisture and mould problem at -40 °C — and how CemPU eliminates them.
Read article →What does a U-value of 0.079 vs. 0.15 mean in a settlement with expensive heating oil? Concrete calculation over a building's lifetime.
Read article →How low can we install in? What pauses does the wind require? Practical know-how from the Greenlandic building season.
Read article →