Thermal bridges in arctic climate — why they become a moisture problem

In Danish climate, a thermal bridge is an energy problem. In Greenland it is a moisture, comfort and mould problem — because the temperature difference between outside and inside is dramatically larger.

In a nutshell

  • Design temperature: Greenland down to -40 °C vs. Denmark's -12 °C — thermal bridges have markedly greater effect
  • Condensation risk: Internal surface temperature can drop below dew point → condensation, moisture damage and mould
  • 30% of heat loss: Poorly detailed linear losses at corners can account for up to 30% of the building's transmission loss
  • CemPU's solution: Load-bearing corner panel with continuous PU insulation — no mechanical break in the core
  • Documented Ψ-value: Linear loss is measured and can feed directly into Greenlandic energy calculation under BR2006

What does a thermal bridge do in arctic climate?

A thermal bridge is a place in the construction where the insulation is weakened — typically where metallic or massive materials pass through an insulating core. Examples: concrete columns through an insulated wall, window reveals, foundation interfaces, penetrations for installations.

In Danish climate (design temperature approx. -12 °C), the thermal bridge lowers the indoor surface temperature by maybe 1–3 °C. This gives a measurable energy loss but rarely comfort or moisture problems.

In Greenland (design temperature down to -40 °C) the difference is far larger. The indoor surface can fall below the dew point, which results in condensation, moisture damage and over time mould.

How big is the thermal bridge effect at -40 °C?

With 21 °C indoors at 50% relative humidity, the dew point is approx. 10 °C. If a thermal bridge lowers the indoor surface temperature below 10 °C, the moisture in the air condenses on the surface.

In Danish climate a thermal bridge has to be quite significant before the surface drops below 10 °C. In Greenlandic climate it is the opposite: even small thermal bridges can push the surface into the condensation range during cold winter periods.

The consequence is classic building damage: moisture in corner joints, black mould at window edges, moisture stains at the foundation interface. Often visible only after 1–3 winters.

Where do thermal bridges arise in traditional Greenlandic construction?

Where do thermal bridges typically arise in traditional construction?

How does CemPU's continuous PU core eliminate thermal bridges?

CemPU is designed without mechanical breaks through the insulation. The PU core runs continuously from the inside to the outside of the element. There are no steel rails, columns or point fixings that break the insulation layer.

This means the U-value documented in the laboratory (0.079 W/m²K) actually holds in the finished construction — rather than being a "paper value" that is reduced by thermal bridges on site.

What should the consultant be aware of with thermal bridges?

Even with thermal-bridge-free wall elements there are still 4 critical details in Greenlandic construction:

Tekment supplies details for all four areas as part of the project package — so the entire building envelope remains thermal-bridge-free, not only the planar wall elements.