How long does shipping to Greenland take?
Container shipping with Royal Arctic Line from Aalborg or Aarhus typically takes 2–4 weeks to Nuuk. Coastal towns may add additional transit time. We plan delivery to fit the building season.
Write to us at info@tekment.dk — we will review the project and return with an assessment of whether CemPU is the right solution for your construction in arctic climate. Feel free to attach drawings, sketches or BR2006 requirements from the municipality.
Short season. Complex logistics.
Limited workforce.
CemPU is designed for exactly that:
A few things that are often practical to have in order before the first conversation — but just send the drawings, and we will help with the rest.
Container shipping with Royal Arctic Line from Aalborg or Aarhus typically takes 2–4 weeks to Nuuk. Coastal towns may add additional transit time. We plan delivery to fit the building season.
Plan, section and facade are typically enough for the first assessment. If you also have structural loads, energy frame or specific BR2006 requirements from the municipality, even better.
Yes. We deliver the full documentation pack for authority application — fire (A2-s1,d0), energy, structural, moisture and acoustics — adapted to the Building Regulation for Greenland.
Yes. Fire class A2-s1,d0 under EN 13501-1 approves CemPU for institutions, multi-storey housing, commercial buildings and industrial halls — building types where PIR/PUR panels are typically refused by Greenlandic authorities.
The earlier, the better. We can engage as a consultant already in the sketch phase — particularly important in Greenland, where production and shipping must be planned 6–9 months before the building season.
The price depends on size, complexity, container quantity and location. We typically provide an indicative price within 2–5 working days — including shipping and installation guidance.
We need a handful of basic details to give a useful answer — but just send what you have, and we will help with the rest.
Single-family home, multi-residential housing, institution, commercial or industrial hall. Gross and net area if possible — this drives container quantity and element subdivision.
Town or settlement — we use it to assess snow/wind load by BR2006 zone and shipping options via Royal Arctic Line.
Which season should the building envelope be ready in? We work backwards on production and shipping — critical with a 4–5 month arctic building season.
Who is driving the project? It helps us coordinate dialogue and documentation with municipality and consultants.
Floor plans, sections or sketches. PDF/DWG/DXF — or even hand-drawn sketch material. We work with what you have.
If the municipality has set specific requirements (fire, acoustics, energy, structural) — share them from the start so we can dimension correctly.