Tekment is in dialogue with consultants, contractors and developers about CemPU deliveries for a range of Greenlandic construction projects. Below are the building categories where CemPU is particularly relevant — assessed against BR2006 requirements, A2 fire class and the short building season.
Short season. Complex logistics.
Limited workforce.
CemPU is designed for exactly that:
CemPU is new to the Greenlandic market. We are in early dialogue with consultants and contractors — below are the four categories where the system delivers the greatest value relative to BR2006, A2 fire and logistics.
A CemPU project for Greenland runs in three phases. The earlier we come in, the better element division and delivery sequence can be adapted to shipping schedule and installation window.
Drawings and project description are assessed against CemPU's geometry, snow and wind load zone, fire strategy and BR2006 energy frame. Result: outline element division and indicative budget.
Detailed element division, structural documentation, fire strategy (A2-s1,d0), energy and moisture calculation. Complete documentation pack for authority application under BR2006.
Production at the factory in Ringe, container packing in installation order, shipping with Royal Arctic Line via Aalborg or Aarhus, and installation in the season window May–September.
A2-s1,d0 under EN 13501-1 is what opens the category. Where PIR/PUR panels are typically refused for multi-storey housing and institutions in Greenland, CemPU is documented for exactly the building types where the need is greatest.
Container packing, shipping schedule with Royal Arctic Line and installation window May–September are planned as one continuous flow. Elements are packed in the order they will be installed — so containers don't need to be turned around on a Greenlandic construction site.
The technical articles behind the project categories — fire classification, logistics, installation and energy economics in arctic climate.
Why A2-s1,d0 opens the doors to institutions and multi-storey housing in Greenland — and where PIR/PUR panels are typically refused.
Read article →Container packing, shipping schedule with Royal Arctic Line and installation window. How we plan the delivery sequence.
Read article →How CemPU installation is carried out in the season window May–September and at low temperatures on the arctic construction site.
Read article →Why prefab is decisive with a 4–5 month building season — and what it means for schedule and risk.
Read article →