In a nutshell
- Fire ceiling for traditional panels: PIR/PUR panels classify B-s2,d0 to C-s3,d0 — limits use to single-family houses under BR2006
- CemPU's class: A2-s1,d0 per EN 13501-1 — "limited contribution to fire" — inorganic cement surface
- BR2006 effect: A2 opens institutions, multi-storey residential and commercial construction directly without compensating measures
- DBI documentation: REI 30 load-bearing tested on full element — directly usable in Greenlandic regulatory review
- Market effect: The fire class opens approximately 3× more building types than traditional PIR/PUR panels can be approved for
What fire requirements does BR2006 set in Greenland?
Greenlandic building authorities have for many years been cautious about prefab panels in anything other than single-family houses. The reservation is primarily about fire: traditional panels with PIR or PUR foam cores are typically classified B-s2,d0 or C-s3,d0 per EN 13501-1 — that is, materials that can contribute to fire development and produce smoke.
For institutions (schools, day-care, healthcare buildings), multi-storey housing and commercial buildings, BR2006 imposes tightened fire requirements that these panels do not meet without extensive compensating measures — and even then approval is uncertain.
What does fire class A2-s1,d0 mean in practice?
CemPU is classified A2-s1,d0 per EN 13501-1. It is the class just below A1 (entirely non-combustible material) and means concretely:
- A2: Only marginal contribution to fire (the class dominated by mineral materials such as concrete, mineral wool and glass)
- s1: Very limited smoke development
- d0: No flaming droplets or particles
This is a substantial step up from B/C class — and for Greenlandic authorities the difference is often the difference between "rejected" and "approved with documentation".
Where is the A2 classification decisive for approval?
The A2 classification opens directly to three building categories where traditional panels are often rejected:
- Multi-storey housing and social housing: Dwelling separations require fire resistance that is difficult to document with a combustible core
- Institutions: Schools, day-care and healthcare buildings have tightened requirements for personal safety
- Commercial buildings: Warehousing, offices and production buildings where fire compartmentation is central
- Industrial halls: Large free spans, open floor plans and high fire requirements — A2-s1,d0 means no combustible insulation in the construction, which reduces fire-load classification and in some zones removes the requirement for sprinkler systems
What does the A2 class mean for the Greenlandic market?
For consultants, the A2 classification means the fire section of the building permit application can be handled with a documented classification report rather than project-specific risk analyses and compensating measures. This reduces both the consultant's hours and the authority's processing time.
For clients it means more building types become realistic with prefab elements — with the associated benefits of a short building season, lower staffing requirements and documented quality from the factory.