In a nutshell
- Same problem to solve: Both are prefab sandwich panels in container — solving short building season and logistics
- Fire class: CemPU A2-s1,d0 vs. PIR/PUR B-s2,d0 to C-s3,d0 — decisive for institutions under BR2006
- U-value: CemPU 0.079 W/m²K vs. PIR/PUR 0.15–0.25 — almost twice the insulation
- Internal surface: CemPU's solid cement is ready for plaster/paint — PIR/PUR panels require additional internal build-up
- Long-term performance: CemPU's PU core is encapsulated by cement → no risk of foam degradation from damaged cladding
What is the difference between CemPU and PIR/PUR panels?
Both CemPU and steel panels with PIR/PUR foam are prefabricated sandwich solutions for arctic building sites. Both solve the logistics problem (a complete building envelope in a container) and the short building season problem (fast dry installation).
The differences lie in material choice and therefore in performance on the parameters that ultimately determine whether the building can be approved and stands the test of time.
How are CemPU and PIR/PUR panels constructed?
CemPU
- Skin: Two solid cement facings (mineral, non-combustible material)
- Core: Continuous polyurethane (PU)
- Bonding: Chemically and mechanically bonded during casting
Steel panel with PIR/PUR
- Skin: Two sheets of steel or cement-bonded boards (variable quality)
- Core: PIR (polyisocyanurate) or PUR (polyurethane), combustible material
- Bonding: Glued or sheet-bonded construction
Which parameters decide between CemPU and PIR/PUR?
| Parameter | CemPU | Steel panel w. PIR/PUR |
|---|---|---|
| Fire classification (EN 13501-1) | A2-s1,d0 | Typically B-s2,d0 to C-s3,d0 |
| U-value (typical wall) | 0.079 W/m²K | 0.15–0.25 W/m²K |
| Internal surface | Solid cement (ready for plaster/paint) | Steel sheet (requires internal build-up for comfort buildings) |
| Acoustics | Good sound attenuation from solid facings | Limited (steel sheets tend to vibrate) |
| Freeze-thaw resistance | Tested (CEN/TS 12390-9) | Steel is resistant, but PUR foam can degrade over time |
| Weight | Higher (solid cement facings) | Lower |
| Use — single-family house | Yes | Yes |
| Use — multi-storey housing/institution | Yes, with documentation | Rarely approved by the authority |
Why is fire class the central dividing line?
For single-family houses, both systems are typically viable. For everything else (institutions, multi-storey housing, commercial, industrial halls), the fire classification is often the point that determines authority approval. CemPU's A2-s1,d0 sits in the class "limited contribution to fire"; PIR/PUR's B/C classes are regarded as combustible material.
See the article on fire compliance for a full review.
How big is the U-value gap between CemPU and PIR/PUR?
CemPU's continuous PU core without mechanical breaks typically gives a U-value around half that of a comparable steel-PIR panel. In settlements with expensive fuel oil (DKK 3–5 per kWh), the difference becomes concrete operating economics over the building's lifetime — see the worked example.
When do PIR/PUR panels still make sense?
It is fair to mention where steel panels can be the right solution:
- Warehouse and some industrial halls with low fire requirements and where low weight is highly prioritised — note however that industrial halls with occupancy, fire compartments or insurer requirements for sprinklers are often better served by CemPU's A2 classification
- Temporary buildings where lifetime economics do not weigh heavily
- Projects with a tight capital budget that does not weight operating costs over time
For permanent residential construction, institutions, industrial halls and buildings with a 50+ year expected lifetime, CemPU's fire and U-value advantages weigh more heavily.