In a nutshell
- Energy in settlements: Heat typically costs DKK 3–5/kWh in Greenlandic settlements vs. DKK 1.5–2.5/kWh in Denmark — heating oil shipped in once a year
- U-value effect: Twice the U-value (CemPU 0.079 vs. traditional 0.15–0.18) gives 50–60% lower heating bill
- Operating saving: A 150 m² house in a settlement can save DKK 8,000–15,000/year compared with traditional construction
- Payback: The CemPU price premium is typically recovered in 8–12 years through lower operating cost
- Lifetime saving: Over 50 years the saving reaches DKK 400,000–800,000 — depending on energy price evolution
Why is energy more expensive in Greenlandic settlements?
While a Danish homeowner pays DKK 1.5–2.5 per kWh for heat (depending on source), heat in Greenlandic settlements typically costs DKK 3–5 per kWh — and in certain settlements without district heating even more. The main reasons are:
- Fuel oil has to be shipped in once a year and stored locally
- Local electricity is often produced with diesel generators
- District heating networks exist only in the largest towns (Nuuk, Sisimiut, Ilulissat)
The consequence: every kWh saved over the lifetime means twice as many kroner as a corresponding saving in Denmark.
How does U-value translate to DKK/m² in Greenland?
A worked example — comparison of two wall constructions over a 60-year building lifetime for a 200 m² house in a typical Greenlandic town:
Assumptions
- Wall area (building envelope): 180 m²
- Indoor comfort: 21 °C
- Annual degree-day sum: approx. 7,000 (typical for coastal towns; higher inland)
- Energy price: DKK 4 per kWh (average over lifetime; probably conservative)
Construction A: Traditional wall, U=0.20 W/m²K
- Annual energy loss through wall: approx. 6,050 kWh/year
- Annual operating costs: approx. DKK 24,200
- Total over 60 years: approx. DKK 1,452,000
Construction B: CemPU wall, U=0.079 W/m²K
- Annual energy loss through wall: approx. 2,390 kWh/year
- Annual operating costs: approx. DKK 9,560
- Total over 60 years: approx. DKK 573,600
Difference: approx. DKK 880,000 over the lifetime for a single house — from the wall construction alone. Roof, floor and windows come on top.
These figures are indicative and depend on the actual climate conditions, indoor environment requirements and energy price. Tekment supplies project-specific energy-frame inputs to the consultant.
What does the U-value mean for client and consultant?
For the client, operating economics is often the most important item over a building's lifetime — particularly for public buildings and social housing where budgets are squeezed across many decades.
For the consultant, U-value is one of the first criteria for BR2006 approval. A lower U-value provides greater design freedom elsewhere in the construction and faster authority processing.
How does CemPU achieve U-value 0.079 W/m²K?
The U-value is the result of three factors:
- Continuous PU core without mechanical breaks (no thermal bridges in the construction)
- Low lambda value for the PU insulation
- Sufficient core thickness sized to the project's energy frame
The actual U-value depends on element thickness and can be optimised per project between 0.079 and higher values if budget and structural requirements demand it.