The building system · Tekment Greenland

CemPU — one element, three functions. Built for arctic climate.

CemPU elements are prefabricated sandwich panels combining load-bearing structure, PU insulation and a cement-based building envelope in one thermal-bridge-free module. Fire class A2-s1,d0 and U-value 0.079 W/m²K — documented to the Building Regulation for Greenland (BR2006).

Build-up

How a CemPU element is constructed

Three layers working together: two cement-based facings hold a high-performance PU core. The result is a strong, slim and thermal-bridge-free wall — particularly suited to arctic temperature gradients.

1 · Exterior cement board (18 mm) Inorganic building envelope. Withstands arctic weather, moisture and freeze-thaw cycles. Tested under CEN/TS 12390-9. Ready for plastered solutions or ventilated facade.
2 · PU insulation core (up to 300 mm) Lambda 0.023 W/mK. High-performance polyurethane, continuous without mechanical breaks. Diffusion-tight and non-hygroscopic — no risk of condensation at -40 °C design temperature.
3 · Interior cement board (18 mm) Load-bearing skin ready for interior surface treatment. Solid cement surface — no nutrition for mould or bacteria in humid indoor climate.
4 · Joints without thermal bridges Precise, industrially produced joints and corner elements. Eliminates typical thermal bridges that in arctic climate become moisture and mould problems.

Why sandwich in Greenland?

The SIP principle (Structural Insulated Panels) has been known from aircraft and shipbuilding since the 1930s: two strong skins sharing load through a light, insulating core. The result is very high strength relative to weight — decisive when elements have to be container-packed and shipped across the Atlantic.

CemPU is the Nordic evolution: cement-based skins instead of timber, so the element is inorganic, moisture-resistant and fire-classified A2-s1,d0 — adapted to Greenland's stricter requirements for fire, energy and arctic climate.

Read more about Tekment
Specifications

Technical properties

Documented, measured values — not marketing claims. The full documentation pack for BR2006 approval is available on the documentation page.

U-value (300 mm)0.079 W/m²K
Lambda value (PU core)0.023 W/mK
Fire classA2-s1,d0 (EN 13501-1) — approved for multi-storey housing, institutions, commercial and industrial halls
Sound reduction (R'w)42–48 dB depending on build-up
Wall thicknesses200 and 300 mm
Max. element sizeHeight up to 3.6 m · Width up to 12 m
Snow load (dimensioned)Per project according to BR2006 zone — typically 2.5–4.0 kN/m²
Wind load (dimensioned)Per project according to EN 1991 — certain areas up to 55+ m/s
Design temperatureDown to -40 °C without loss of load-bearing or insulation capacity
Freeze-thaw resistanceTested under CEN/TS 12390-9
Load-bearing constructionSandwich — load distributed across both skins
SurfacesCement-based board, ready for plastering / cladding
Container packingApprox. 100–150 m² of wall per 40-foot sea container
CE markingDocumented under EN 14509 and ETA approval
Advantages

What does it mean in practice in Greenland?

Three measurable differences that address specifically Greenlandic challenges.

🔥

A2 opens the doors

Fire class A2-s1,d0 approves CemPU for multi-storey housing, institutions, commercial buildings and industrial halls — not just single-family houses to which typical steel panels with PIR/PUR (B/C class) are limited.

⏱

Closed before winter

Closed building envelope in days rather than months. Decisive with a 4–5 month building season (May–September). No wet processes, no drying time.

📦

Container delivery

100–150 m² of wall per 40-foot container. Packed at the factory in Ringe, shipped via Royal Arctic Line. Fewer links, less risk, fewer delays.

See it in practice

Technical knowledge, comparisons and documentation

How CemPU works in practice — from fire classification and BR2006 documentation to logistics and installation on the arctic construction site.

Should CemPU be used in your next Greenland project?

Send drawings and project description. We assess element division, BR2006 documentation needs, container quantity and installation schedule.