Tekment ApS is a Danish development and manufacturing company behind the CemPU building system: cement-based sandwich elements with A2 fire classification and U-value 0.079 W/m²K. We supply Greenland with documentation under BR2006 as standard and container-packed logistics via Royal Arctic Line.
Tekment is established as a Danish development and design company focused on simple, energy-efficient and documentable building systems. We work with industrialised production of walls and roofs, so as much quality as possible is secured at the factory — and as little as possible is left to chance on the building site. This is an approach particularly well suited to arctic construction sites, where the season is short and every day in the building envelope costs.
The basic idea behind CemPU is that load-bearing structure, insulation and surfaces are combined in one prefabricated element. This delivers:
The Greenlandic construction market has a real need for a fire-documented prefab system. Short building seasons, long transport and stricter fire requirements mean that every decision at the factory saves weeks on the construction site.
The effective building season in Greenland is typically 4–5 months (May–September). With CemPU the building envelope is closed in days to a few weeks rather than months, so interior trades can start before winter — without wet processes or drying time.
Conventional steel panels with PIR/PUR foam (B/C fire class) are often refused for multi-storey housing, institutions, commercial buildings and industrial halls in Greenland. CemPU's A2-s1,d0 classification under EN 13501-1 opens the doors to the building types where the need is greatest.
When elements have to be shipped via Aalborg or Aarhus to Nuuk or a coastal town, packing density and order become part of the design. We pack 100–150 m² of wall per 40-foot container and plan delivery so the installation order matches container unloading.
The Building Regulation for Greenland (BR2006) sets requirements for fire, energy, structural, moisture and acoustics. We deliver documentation under BR2006 as standard — not as an add-on — so the consultant can focus on the project rather than collecting data sheets.
The entire delivery is handled in close dialogue — from the first drawing meeting through factory planning to installation support on site. Fewer links between consultant, factory and construction site means fewer lost details and faster clarification when something needs adjusting.
Where classic SIP solutions are often based on timber boards, CemPU is developed for Nordic and arctic conditions with focus on robustness, fire and moisture. The system combines:
The result is slim walls, short construction time and a high level of documentation — without compromising either comfort or architecture, and with a design temperature down to -40 °C.
Tekment's CemPU system is developed with the entire life cycle in mind — from production to operation and later rebuilding or renovation. We continuously work with data for LCA and EPDs, so consultants, contractors and developers can document their projects — including when the client is a Greenlandic municipality or the Government.
In this way Tekment combines almost 100 years of technological development in sandwich and SIP constructions with a Danish, practice-oriented approach to modern construction in Greenland.
Documented numbers — not marketing claims. The four key figures that most often determine whether a Greenlandic project can use CemPU.
A Greenlandic project rarely has room for loose ends. We therefore enter the process early and work closely with architect, engineer and contractor — from the first sketches to installation on site.
CemPU elements are produced at Tekment's factory in Ringe on Funen. Industrial CNC cutting ensures ±2 mm precision on the joints, and each element is checked and labelled before it leaves the hall. For Greenlandic projects the elements are packed in 40-foot sea containers — typically 100–150 m² of wall per container — and shipped via Aalborg or Aarhus with Royal Arctic Line to Nuuk or directly to a coastal town.
We plan the packing order so that elements come out of the container in the order the installation team needs them. This reduces interim storage on site and gives a more predictable installation flow in a climate where weather can quickly change the plan.
Brief about the company and contact details.
| Established | 2018 |
|---|---|
| VAT/CVR | DK39406373 |
| Factory | Bakkevej 19, 5750 Ringe, Denmark |
| info@tekment.dk | |
| Market area | Greenland, Denmark, Nordics and Northern Germany |
| Primary target group (Greenland) | Architects, consulting engineers, contractors, municipalities and developers in Greenland |
| Logistics to Greenland | 40-foot sea containers via Royal Arctic Line (Aalborg/Aarhus → Nuuk and coastal towns) |