BR2006 vs. BR18 — what is the difference?

The Building Regulation for Greenland (BR2006) is in many areas stricter than the Danish BR18, because construction has to perform in arctic climate. Here are the central differences.

In a nutshell

  • Different building codes: BR2006 (Greenland) is set by Naalakkersuisut and administered by the municipalities — BR18 (Denmark) does not apply in Greenland
  • Building permit: Issued locally per BR2006 — regardless of whether the consultant normally works under BR18
  • Energy requirements: BR2006 has its own U-value requirements adapted to arctic climate — typically stricter on external walls than BR18
  • Load dimensioning: EN 1991 applies in both — but Greenlandic snow loads (up to 4.5 kN/m²) and wind loads (up to 2.8 kN/m²) are markedly higher
  • Fire: EN 13501-1 applies in both — A2 classification has the same legal effect but is more often required in Greenland due to remoteness

Who sets the building code in Greenland?

BR2006 is set by Naalakkersuisut (the Government of Greenland) and is administered locally by the municipalities — Kommuneqarfik Sermersooq, Qeqqata Kommunia, Avannaata Kommunia and Kommune Kujalleq. The Danish BR18 is set by the Danish Housing and Planning Authority and does not apply in Greenland.

This means a building permit in Greenland is issued under BR2006 — regardless of whether the consultant is Danish-trained and normally works with BR18.

What are the central differences between BR2006 and BR18?

The most important areas where BR2006 differs from BR18:

Energy and U-values

BR2006 imposes stricter requirements for the insulating performance of the building envelope, because the design temperature in Greenland can be down to -40 °C (compared to typically -12 °C in Denmark). The consequence is that wall constructions must be thicker — or built with materials with lower lambda values — to meet the energy frame.

Snow load and wind load

Whereas BR18 in Denmark typically reckons with snow loads in the order of 0.9–1.2 kN/m², BR2006 often requires zone-specific values of 2.5–4.0 kN/m². Wind load can likewise be substantially higher — in certain areas wind speeds above 55 m/s are documented.

Moisture engineering and freeze-thaw

BR2006 places greater emphasis on documentation of moisture-engineering conditions under large temperature gradients. Constructions must be able to handle the many freeze-thaw cycles in spring and autumn without loss of load-bearing capacity. Documentation per CEN/TS 12390-9 for the frost resistance of concrete is often required.

Fire

The fire requirements follow the same European classification system (EN 13501-1) as BR18, but the building authority's practice is typically stricter when approving prefab panels in institutions and multi-storey housing. See the article on fire compliance.

What do the differences mean for prefab construction in Greenland?

The differences mean that a panel or element solution which meets BR18 in Denmark does not automatically meet BR2006 in Greenland. In particular the energy frame and the structural design must be recalculated per project with the actual Greenlandic load and temperature requirements.

CemPU is supplied with project-specific documentation that directly addresses the BR2006 requirements — not as an add-on, but as standard.