In a nutshell
- Dry assembly: CemPU is mechanically fastened without mortar or concrete — independent of the +5 °C threshold
- Weather-independent: Fog, rain, overnight frost and temperature swings do not delay installation — critical in Greenlandic climate
- Year-round: Can be installed in winter months when traditional construction is at a standstill
- No frost damage: Cement boards and PU core do not absorb water — no risk of frost cracking or drying defects
- Effective building season: Extends usable installation period from 4–5 months to year-round — decisive for project economics in settlements
Why are wet construction processes a risk in Greenland?
Mortar and concrete typically require a minimum of +5 °C to cure correctly and should not be exposed to precipitation during curing. On a Greenlandic building site — even in the summer months — that is not guaranteed. Fog, rain, brief overnight frost and temperature swings over the day are common.
The consequence in traditional construction is that mortar and concrete work often has to be interrupted or requires heating and covering. This steals precious days from the already short building season and introduces quality risks (frost damage, drying cracks, lack of strength).
How does CemPU's dry installation work in cold weather?
The CemPU elements arrive as finished sandwich panels. Installation primarily consists of:
- Unloading from container with crane
- Placement on the foundation with precisely cast-in anchoring
- Mechanical assembly of element to element with documented joint details
- Sealing of joints with flexible sealing tapes and sealants specified for arctic temperatures
There is no mortar and no drying time. The building envelope is functional and closed on the same day the installation is completed.
What temperature limits apply to CemPU installation?
CemPU can be handled down to the temperatures at which the installation team can work safely (typically around -10 °C). The critical dependence is not the material itself, but:
- Sealants: Specified for low application temperatures (down to -20 °C)
- Sealing tapes: Must remain flexible at low temperatures
- Personnel safety: Wind, visibility and slippery surfaces often weigh more heavily than the material
In practice this means CemPU can be installed a couple of months longer than traditional masonry — relevant if the building season is extended due to delays earlier in the project.
How is quality assured during installation in arctic conditions?
Each element installation follows a documented protocol:
- Visual inspection of the element on unloading (transport damage)
- Plumb and fit are checked per element
- Joints and seals are photographed for the project's handover documentation
- Final moisture test of the building envelope (recommended: blower-door or thermography after closure)
The documentation forms part of the project's handover to the client and the authority.
How many fitters does CemPU installation require in Greenland?
Traditional masonry in Greenland requires multiple trades: bricklayers, concrete workers, insulators, carpenters. Each trade has to be flown in, accommodated and paid. CemPU installation is handled by a small qualified team — typically 3–5 people plus a crane operator — who can be trained on a single delivery rather than several.