What U-value 0.11 means for operating costs

For private clients, the most important figure is not the construction price – it is the operating cost. A low U-value means low heating bills for decades.

What U-value 0.11 means for operating costs

In a nutshell

  • U-value gap: Traditional external wall 0.15–0.20 W/m²K vs. CemPU 336 mm at 0.079 — almost half the transmission loss
  • Annual saving: DKK 3,000–6,000/year in heating on a 150 m² family house at 2026 prices
  • Lifetime saving: DKK 90,000–180,000 over 30 years — typically double when energy price rises are factored in
  • Comfort: Stable interior surface temperature without draughts and thermal bridges
  • Durability: The PU core does not degrade over time — U-value holds throughout the building's 50+ year lifetime
U=0.11
W/m²K
Low U-value
CemPU
Lower
heat loss
Lower
operating cost
Stable
surface temperature
Comfort
no draughts
20+ years
service life
Long operation
without degradation

How much can be saved on operating cost with a lower U-value?

For private clients, the most important figure is not the construction price – it is the operating cost. A low U-value means low heating bills for decades. The audience for this information is end customers and developers.

What does the U-value mean in DKK per year?

A traditional external wall in Danish new-build typically has a U-value of 0.15–0.20 W/m²K. The CemPU panel (Tekment 235 with 209 mm PU core) sits at 0.114 W/m²K, and Tekment 336 with 300 mm PU core down to 0.079 W/m²K. That difference of perhaps 30–50% fewer U-value watts becomes perhaps 30–50% lower transmission loss through the facade over winter.

How much does it mean in DKK? It depends on the size of the house, the climate load and the price of the heat source. As a rough rule of thumb: For a 150 m² detached house with about 100 m² of external wall, the difference between a good and a moderate external wall can be DKK 3,000–6,000/year in heating at 2026 prices. Over 30 years that becomes DKK 90,000–180,000 — with interest and energy price increases often double that.

How do I calculate operating savings for my project?

Our price calculator shows the CemPU wall's capital price per m². Combine that with a project-specific operating estimate and you have both capital and operating economics on the same spreadsheet.

Where do I find documentation for the U-value?

All claims here are supported by the sources listed at the bottom of the page. Send an email to info@tekment.dk if you need access to the full reports.

Sources and documentation

Get an operating-cost estimate for your project

We refer you to advisers who deliver project-specific operating calculations.

Book operations contact