A building system for developers who want the numbers up front

As a developer, your biggest risks are not the trades themselves – they are time, documentation and unexpected invoices. CemPU is built to remove all three by moving complexity into production.

A building system for developers who want the numbers up front
~5 days
typical detached house
Envelope closed
installation
0 L
documented
Construction moisture
closed-cell PU
56.8
kg CO₂e/m²
A1–A4
LCA report
1
delivery
Interfaces
not 8+ trades

What does what you cannot see cost?

The most expensive items in a build rarely appear in the contract: waiting time for concrete floor drying, four trades that have to be coordinated around the same m², remediation in year 2 because the thermal bridge was never properly solved, and LCA figures that do not add up as the deadline approaches.

Those are the same risks CemPU is designed to remove. We have not invented a new material – we have removed the intermediate steps.

Three guarantees you don't get elsewhere

1. A schedule that holds

Envelope closed in days rather than weeks. No drying times before the next trade can start. No weather dependency in installation. The schedule depends on the project, but we provide concrete references from completed projects when we start the dialogue.

2. A CO₂ account that can be defended

56.8 kg CO₂e/m² (A1–A4) for the Tekment 336 panel with low-GWP PU core — documented per EN 15804+A2. Your LCA consultant gets direct access to the calculation basis and can use the figures without further assumptions.

3. Fewer interfaces, fewer surprises

One delivery that integrates load-bearing, insulation and envelope. This reduces the number of trades and interfaces – and thus the number of potential conflict points in execution.

It is not a product choice. It is a project management choice. Fewer trades, fewer interfaces, fewer surprises – and documentation that can be defended to authorities, banks and investors.