BR25 is here. The documentation is ready.

BR25 tightens the requirements for climate impact, energy and documentation. Tekment delivers a complete pack with LCA (A1–A4), fire reports, acoustics, structural and installation – so the consultant can work directly.

BR25 is here. The documentation is ready.

In a nutshell

  • LCA ready: 56.8 kg CO₂e/m² (A1–A4) per EN 15804+A2 — directly usable in BR25 energy calculation
  • Fire report from DBI: REI 30 load-bearing + A2-s1,d0 cement board per EN 13501-1
  • Acoustic evidence: R'w ≈ 43 dB from 103 ApS — meets BR25 requirements for residential separating walls
  • Structural documented: Calculations per EN 1991 — project-specific loads available from Tekment
  • Ready pack for the consultant: The full BR25 documentation pack can be delivered from the first project meeting — no waiting for authority approval
56.8
kg CO₂e/m²
A1–A4
LCA
REI 30
DBI
Fire
load-bearing
A2-s1, d0
EN 13501-1
Cement board
fire classification
43 dB
R_w
Acoustics
panel

What does BR25 require of building systems?

BR25 builds on BR18 with stricter climate requirements (limits for CO₂e/m²/year), increased documentation requirements for LCA (modules A1–A3 and in practice also A5) and specific energy frame requirements. This means the building system must deliver both performance and documentation – not just one of the two.

What does Tekment's BR25 documentation pack contain?

Note: Source documents are in Danish. English summaries available on request.

How does the consultant use the BR25 pack in the project?

The LCA figures are loaded directly into the client's LCA software (Be18/LCAbyg). The fire reports are used in the fire strategy. Acoustics feed into the design of party walls and room acoustics. The structural report forms the basis for the engineer's calculations. Everything is compatible with the standard Danish tools.

Tip for the consultant: The documents can be downloaded in one ZIP file. That typically saves half a day of preliminary research at the project's first sketch phase.

Sources and documentation

Download the full BR25 pack

Send a message with the project type and we will send the documentation in the relevant scope.

Download BR25 documentation