Can render be applied directly on CemPU? Yes.

The exterior cement particle board on CemPU is a directly suitable substrate for reinforced mesh render. No ventilation cavities. No additional substructure. Here are the compatible systems.

Can render be applied directly on CemPU? Yes.
Direct
application
No ventilation
required
3–5 mm
base
+ 2–4 mm finish
total 4–8 mm
A2 fire
retained
Render over
A2 board
All colours
possible
Float, ribbed
smooth or wash-textured

Principles for render on CemPU

The Cetris cement particle boards on the exterior have a cement-based surface that works directly as a substrate for traditional Danish mesh-render systems. Clean the surface, apply primer/bonding bridge, the first layer of reinforcement render with alkali-resistant mesh (3–5 mm), and the finish render (2–4 mm).

Compatible systems

Weber / Saint-Gobain

Weber.pas / Weber.mineral / Weber.therm range – reinforced thin render, mineral or cement-based. Popular for detached houses, vapour-open, impact-resistant, can be float-finished, ribbed or painted in any colour.

Sto Denmark

StoRend / StoSilco / StoClassic – premium mesh render with silicone resin or mineral. Extremely durable, weather-resistant, often used on modern low-energy houses.

Skalflex, Baumit and others

Sources and documentation

Get a render specification for your project

Send the drawing — we propose a render system tailored to your project's requirements.

Order render specification