Fibre cement – James Hardie, Swisspearl, Cedral, EQUITONE
The most popular fibre-cement facades on CemPU are HardiePlank (timber look), Swisspearl Largo (large boards in Carat, Reflex, Nobilis and others), Cedral Click (easy installation for renovation), and EQUITONE (through-coloured, architectural premium). Mounted on a ventilated substructure in aluminium or galvanised steel, with a 25–50 mm cavity behind.
Rendered facade (mesh render)
Weber, Sto, Skalflex, Baumit – see the dedicated page for details. Classic Danish facade expression, minimal maintenance.
Timber cladding
Larch, cedar, thermowood or painted shiplap. Mounted on battens with a 25–40 mm ventilated cavity. Classic Nordic look.
Brick / stoneware
Technical options for brick or stoneware skins exist – requires specific design and structural assessment.
