Mould has nothing to grow in

Mould needs three things: moisture, nutrients and time. CemPU removes the nutrients by using inorganic materials and eliminates the moisture by absorbing 0 litres of construction water.

Mould has nothing to grow in
0 L
construction moisture
Does not absorb water
closed-cell PU
Inorganic
envelope
Cement-based
no nutrients
0
cavities
In the joint
no condensation zone
A2-s1, d0
EN 13501-1
Cement board
also fire-safe

Why mould develops in Danish construction

Mould problems in new construction rarely have a single cause. It is typically a combination of construction moisture that is not dried out, thermal bridges that produce local condensation, and organic materials (timber, paper, organic insulation) that feed mould spores.

How CemPU breaks the chain

Long-term indoor climate profile

The result is a building where the indoor climate does not degrade over the years. We see in practice that CemPU buildings after 10+ years of operation do not develop the typical mould patches in corners and window reveals that traditional construction can develop.

Sources and documentation

Get a health check on your project

We help with risk assessment of construction moisture, thermal bridges and indoor climate.

Book indoor-climate check