Thermal bridges cost up to 30% of heat loss

Thermal bridges are not a material problem – they are a detailing problem. We have therefore designed a load-bearing corner panel where the insulation continues through the joint. You don't compensate on site – you solve it in production.

Thermal bridges cost up to 30% of heat loss

In a nutshell

  • 30% of heat loss: Poorly detailed linear losses at corner joints account for up to 30% of total transmission loss — per SBi guideline 213
  • Condensation and mould: Cold internal surfaces create risk of condensation and mould formation in corners after 2–3 years of operation
  • Tekment corner panel: Load-bearing corner with continuous insulation — no cold metal brackets or timber penetrations
  • Documented Ψ-value: Linear loss is measured and can feed directly into the project's Be18 energy calculation
  • Detailing problem solved in production: No site-dependent compensation — the thermal bridge is eliminated before installation
up to 30%
of heat loss
Typical linear loss
in poor corners
SBi 213
guideline
Documented
industry standard
Continuous
insulation
Tekment corner
eliminates the loss
Ψ-value
project-specific
For Be18
directly usable

How much of the heat loss do thermal bridges account for?

According to SBi guideline 213, poorly detailed linear losses at corner joints can account for up to 30% of the total transmission heat loss. That means lower internal surface temperature, risk of condensation, and in the worst case mould formation in the corners after 2–3 years of operation.

How does Tekment's corner panel eliminate the thermal bridge?

Our load-bearing corner panel is developed with continuous insulation. There are no cold metal brackets or wood penetrations. The joint has a documented linear loss (Ψ value) which can feed directly into the project's energy calculation.

What it means in practice

Our experience is clear: If the detail is not properly solved, neither good intentions nor impressive LCA figures help. That is why we spend time on the corner detail – it is almost always critical.

Sources and documentation

Get the corner detail for your project

Send your drawings and we provide the project-specific psi values and a CAD detail.