CemPU is a load-bearing sandwich panel with documented structural performance. Here you will find load tables, design basis and documentation for use in the structural calculations for your project.
In a sandwich panel the two facings carry loads through the insulating core – a classic beam action where the facings take tension and compression respectively. The result is a load-bearing structure with low weight relative to its strength.
For CemPU panels the load-bearing capacity is documented through European design certificates and is tested on an ongoing basis. This gives consulting engineers a valid basis for the structural calculations without having to set up new assumptions for each project.
Indicative values based on standard build-ups. Contact us for project-specific calculations.
| Wall height up to 2.7 m · wall thickness 200 mm | Vertical load up to 30 kN/m |
|---|---|
| Wall height up to 3.6 m · wall thickness 250 mm | Vertical load up to 40 kN/m |
| Wall height up to 3.6 m · wall thickness 300 mm | Vertical load up to 50 kN/m |
| Stabilising wall (shear action) | Takes horizontal loads in the plane of the wall |
| Wind load | Designed according to EN 1991-1-4 (Eurocode 1) |
| Max. panel length | Up to 12 m in a single continuous facing |
| Design basis | European design certificate + project-specific calculation |
Structural calculation and load-bearing documentation for the CemPU building system. For use in project-specific structural calculations.
If you need project-specific documentation – e.g. tailored load tables or collaboration with your consulting engineer – contact us with your project data.