Build even when it freezes

In Danish construction, winter traditionally means pauses, tarpaulins and wet material that has to be discarded. CemPU panels are designed to perform the same way on a Tuesday in November and a Monday in July.

Build even when it freezes

In a nutshell

  • No mortar: CemPU is mechanically fastened with screws — can be installed in frost without the +5 °C requirement
  • 0 litres of construction moisture: Cement boards and PU core do not absorb water — no drying time in winter
  • ~5 days to weathertight shell: The full envelope is in place before winter storm or frost halts the build
  • Less weather delay: No tarpaulins, no drying periods, no wet material to discard
  • Weather-resistant boards: A2-classified cement boards (EN 13986) tolerate rain, frost and UV without extra protection
0 L
construction moisture
No drying out
even in winter
Mechanical
fastening
Installation in frost
with screws
~5 days
to weathertight shell
Winter-relevant
detached house
A2
cement board
Weather-resistant
EN 13986

What does winter weather cost a traditional construction site?

In a traditional build, frost means the mortar will not cure. Rain means gypsum boards and insulation absorb moisture that has to be dried out later. Wind means cranes have to stop and drying periods are extended. All three hit schedule, economics and the CO₂ account.

Why can CemPU be installed in frost and rain?

How does CemPU installation work during frost periods?

CNC-pre-machined panels are delivered ready for installation and typically lifted with a mobile crane. Fastening is done with screws through pre-drilled holes. Sealing is performed after the panels are raised, with FR acrylic sealant that works across the widest temperature range. Roof and envelope can be closed before the first winter shower hits in earnest.

What it means in practice: A project that traditionally stops from December to March can continue through the winter with CemPU. Consequence: 3–4 months shorter total build time and lower interest costs for the developer.

Sources and documentation

Plan your winter build

We help with schedule, logistics and installation readiness for your specific site.