In a nutshell
- No mortar: CemPU is mechanically fastened with screws — can be installed in frost without the +5 °C requirement
- 0 litres of construction moisture: Cement boards and PU core do not absorb water — no drying time in winter
- ~5 days to weathertight shell: The full envelope is in place before winter storm or frost halts the build
- Less weather delay: No tarpaulins, no drying periods, no wet material to discard
- Weather-resistant boards: A2-classified cement boards (EN 13986) tolerate rain, frost and UV without extra protection
What does winter weather cost a traditional construction site?
In a traditional build, frost means the mortar will not cure. Rain means gypsum boards and insulation absorb moisture that has to be dried out later. Wind means cranes have to stop and drying periods are extended. All three hit schedule, economics and the CO₂ account.
Why can CemPU be installed in frost and rain?
- Cement-based boards on the exterior and interior do not absorb water.
- The PU core is closed-cell and acts as a vapour barrier and insulation in one.
- No drying time – the panel is the envelope from the first second.
- Mechanical fastening with screws, not sealant that has to cure within specific temperatures.
How does CemPU installation work during frost periods?
CNC-pre-machined panels are delivered ready for installation and typically lifted with a mobile crane. Fastening is done with screws through pre-drilled holes. Sealing is performed after the panels are raised, with FR acrylic sealant that works across the widest temperature range. Roof and envelope can be closed before the first winter shower hits in earnest.