The 5 days in detail
Day 1 – Foundation ready
By the time CemPU arrives, the foundation should be cast, levelled and ready. We provide a foundation specification tailored to your project.
Day 2 – Wall panels lifted
Panels are delivered CNC-pre-machined and lifted into place with a mobile crane. Typically 8–12 wall panels in a day.
Day 3 – Roof and joints
Roof panels (SIPS Roof 336) are installed. Joints are sealed with FR acrylic and foamed with Graft FR.
Day 4 – Windows and openings
Windows and doors are installed in the CNC-cut openings. No on-site adjustment.
Day 5 – Closed, dry, ready
The envelope is closed. Internal trades can start without waiting time. No construction moisture to drive out.