Timelapse – CemPU installation on site

A quick overview of the installation sequence with Tekment's CemPU sandwich panels – from lifting the panels to the finished envelope. Gives a realistic picture of the time required.

← Assembly video Back to building system
Facts

What does the timelapse show?

Typical key figures from the type of construction you see in the video.

⏱

5–11 days

Typical time to reach a weathertight shell, depending on size and complexity.

🚫💧

No wet trades

Dry installation with no render, concrete or casting in the envelope.

👷

3–4 people

A small crew is enough to handle standard panels.

📏

Up to 12 m

Maximum panel length in a single continuous facing.