5–11 days
Typical time to reach a weathertight shell, depending on size and complexity.
A quick overview of the installation sequence with Tekment's CemPU sandwich panels – from lifting the panels to the finished envelope. Gives a realistic picture of the time required.
Typical key figures from the type of construction you see in the video.
Typical time to reach a weathertight shell, depending on size and complexity.
Dry installation with no render, concrete or casting in the envelope.
A small crew is enough to handle standard panels.
Maximum panel length in a single continuous facing.