In Greenland, the Faroe Islands and remote Northern German regions, risks are amplified: a short build season (or a short weekly installation window), complex transport and difficulty bringing in additional trades at short notice. Prefabrication is not an option — it is a necessity. Tekment delivers across the Nordics, Greenland and Northern Germany.

Building at the edge of the map?

In a nutshell

  • Short building season: Greenland has 4–5 months per year for construction — CemPU's dry assembly in 5–11 days makes the season usable
  • Container logistics: 100–150 m² wall per 40 ft container with Royal Arctic Line or Eimskip — typically twice that of imported prefab houses
  • Few trades on site: One delivery covers load-bearing, insulation and envelope — critical when extra craftsmen cannot be brought in at short notice
  • Known performance: Fire A2-s1,d0, U-value 0.079 W/m²K, snow load up to 4.5 kN/m² (EN 1991) — all documented before transport
  • Market coverage: Tekment delivers to Greenland, the Faroe Islands, Iceland and Northern Germany — typically via Aarhus or Aalborg port
Short season
handled
Prefab = fast
installation
Complex logistics
planned
Container-friendly
packaging
Few trades
required
One delivery
one combined fitter training
Known
performance
Fire, energy, structural
documented up front

Why is arctic construction harder than Danish construction?

In Greenland, the Faroe Islands and arctic projects, risks are amplified: short build season, complex transport and difficulty bringing in additional trades. Prefabrication is not an option — it is a necessity. The same logistical principles apply to all remote markets where Tekment works, including Northern Germany.

What makes Greenland and the North Atlantic a special construction market?

The build season in Greenland is typically only 4–5 months (May–September). In that period everything must happen on site: foundation cast, roof laid, envelope closed. With traditional masonry that is almost impossible because mortar and concrete need drying time. With CemPU panels, the envelope arrives ready for installation in a container — 100–150 m² of wall per 40-foot container.

The Faroe Islands, Iceland and Svalbard have similar challenges with shipping logistics and weather-dependent installation. Tekment typically delivers via roll-on/roll-off container from Aarhus or Aalborg port to Nuuk and Tórshavn.

Why is Northern Germany also a remote construction market?

Northern Germany (Schleswig-Holstein, Mecklenburg-Vorpommern, the Hamburg region) is geographically close to Tekment's factory in Ringe — often shorter transport than to North Jutland or Bornholm. Germany also offers:

Freight is straightforward: standard delivery by Danish haulier on a Euro 6 truck within 1–2 days from the factory. No customs formalities within the EU. The biggest difference from the arctic market is tempo: in Northern Germany deliveries are continuous throughout the year, whereas Greenland operates in seasonal windows.

What documentation exists for CemPU in arctic climate?

All claims here are supported by the sources listed at the bottom of the page. Send an email to info@tekment.dk if you need access to the full reports.

Sources and documentation

Get a logistics plan for your remote project

We help with shipping, container plans and on-site fitter training so the season is used optimally.

Book project review