In a nutshell
- Myth: "Prefab all looks the same" — False. CemPU has free facade choice (Hardie, Swisspearl, render, timber). Standardisation is in the construction, not the architecture
- Myth: "Prefab is more expensive" — False. When build time, fewer errors and earlier handover are factored in, CemPU's total price is typically lower
- Myth: "Prefab doesn't last" — False. CemPU is DBI-documented with REI 30 load-bearing and A2-s1,d0 fire class
- Myth: "Prefab doesn't suit individual houses" — False. CNC cutting to drawing works on small batches and skewed geometry
- Myth: "Prefab is only for large projects" — False. Small detached houses, holiday homes and extensions are Tekment's everyday work
Myth 1
"all looks the same"
Free facade choice
Hardie, Swisspearl, render
Myth 2
"expensive"
Lower m² price
when time and errors counted
Myth 3
"doesn't last"
REI 30, A2
DBI-documented
Myth 4
"not individual"
CNC to drawing
also small batches
What myths exist about prefabricated construction?
Prefabricated construction is met with five classic myths. Here they are – and the documentation that contradicts them. The audience for this information is broad — sceptics.
Where do I find documentation that contradicts the myths?
All claims here are supported by the sources listed at the bottom of the page. Send an email to info@tekment.dk if you need access to the full reports.
