Time has moved on from 1995-style construction

Danish construction is still wrestling with the same problems in 2026 as in 1995: drying times that wreck schedules, thermal bridges that steal energy, and weather dependency that creates moisture and mould problems. We have chosen a different path.

Time has moved on from 1995-style construction
REI 30
DBI-documented
Fire resistance
load-bearing
A2
s1, d0
Cement board
EN 13501-1
56.8
kg CO₂e/m²
A1–A4
LCA client report
43 dB
R_w
Sound reduction
336 mm panel

The problems are not the craftsmen's. They are the system's.

Most Danish contractors work hard and meticulously. The problems do not lie with them – they lie in a building system born for a different era. When traditional materials meet damp autumn air, it is the system that fails, not the craftsman.

That means drying times of several weeks, hundreds of litres of construction moisture later driven out with electric heaters, thermal bridges in corner joints that produce mould patches in the living room after two years, and a CO₂ account where Module A5 alone can tip the project over the BR25 limit.

How CemPU changes the equation

It is not a material choice – it is a system choice. When the developer accepts fewer interfaces, fewer trades and known performance, the most expensive items in a build go away on their own: omissions, errors and delays.

Who should take a closer look?

Are you an architect under pressure on the energy frame and LCA in BR25 projects? A developer or turnkey contractor who has to keep the schedule and budget? A client who wants to build a house that lasts 50 years without mould? Then it is time for a 20-minute project review.

Sources and documentation

Get a 20-minute project review

Send your drawing and we will reply with figures: capital price, schedule, U-value and CO₂.

Book project review