FAQ · Tekment Greenland

Frequently asked questions about CemPU for construction in Greenland

28 concrete answers with numbers — about BR2006 compliance, A2-s1,d0 fire class, U-value 0.079 W/m²K in arctic climate, Royal Arctic Line logistics, 4-5 month building season, snow and wind loads. Written for architects, consulting engineers, contractors, municipalities and developers building in Greenland.

Seven topic areas

Jump directly to your question

The FAQ is structured into seven topics with focus on Greenlandic challenges.

01 · Technical & fire

Technical questions & fire

U-value, fire class and build-up in arctic context.

What is the U-value of CemPU in arctic climate?

The CemPU 336 mm element has documented U-value 0.079 W/m²K — measured and held in finished construction. The continuous PU core (lambda 0.023 W/mK) without mechanical breaks means the laboratory value actually holds at -40 °C design temperature without risk of condensation.

U-value & operating economics →

What does fire class A2-s1,d0 mean for Greenlandic projects?

A2-s1,d0 under EN 13501-1 means limited contribution to fire, very low smoke development and no flaming droplets. This is the second-highest fire class for construction products and qualifies CemPU for multi-storey housing, day-care institutions, care homes, schools, commercial and industrial halls under BR2006 — building types where PIR/PUR panels are typically refused.

A2 opens the doors →

Does CemPU comply with the Building Regulation for Greenland (BR2006)?

Yes. CemPU meets BR2006 requirements for energy frame (U-value 0.079 W/m²K), fire (A2-s1,d0), structural design (snow and wind load under EN 1991), moisture engineering and acoustics. Complete documentation pack is delivered per project — adapted to building category and load zone in Greenland.

See BR2006 documentation →

What does a CemPU element consist of?

CemPU has three layers: exterior cement board (18 mm), PU insulation core (up to 300 mm) and interior cement board (18 mm). They are assembled at the factory in Ringe into one load-bearing, insulating and moisture-resistant module. CNC cutting gives ±1 mm tolerance — critical to avoid thermal bridges in arctic climate.

See the building system →
02 · Structural & climate

Structural & climate

Snow load, wind load and freeze-thaw resistance in arctic conditions.

What snow loads is CemPU dimensioned for in Greenland?

CemPU is dimensioned per project under EN 1991-1-3 and BR2006 zone-specific characteristic snow loads. Typical Greenlandic requirements: 2.5–4.0 kN/m² on the ground. In highland areas and certain coastal towns values of 5.0+ kN/m² may occur. Stamped structural documentation is delivered per project.

Snow & wind load →

What wind loads does CemPU handle?

Wind load under EN 1991-1-4 with Greenlandic basic wind speeds. Certain zones — particularly coastal towns in South Greenland and mountain areas — have dimensioning wind speeds up to 55+ m/s with associated gusts. The sandwich construction distributes wind load across both cement skins and provides high stiffness per wall unit.

Read more →

How is freeze-thaw resistance documented?

The cement skins are tested under CEN/TS 12390-9 (freeze-thaw resistance for concrete). The inorganic cement matrix has no capillary suction of free water and is non-hygroscopic, eliminating the volume expansion in freeze cycles that destroys porous facade materials in arctic climate.

Thermal bridges in arctic climate →

How are foundation details handled in permafrost areas?

CemPU's low dead weight (typically 60 kg/m²) is an advantage with permafrost-tolerant foundations and elevated point foundations common in Greenland. The detail between element and foundation keeps the thermal bridge minimised across the ground floor connection and is delivered as CAD details per project.

Order details →
03 · Logistics & installation

Logistics & installation

Royal Arctic Line, container packing, building season and installation in cold weather.

How quickly can the building envelope be closed on a Greenlandic site?

A closed shell with CemPU typically takes 5–11 days depending on project size — decisive given the short Greenlandic building season of 4–5 months (May–September). By comparison, in-situ cast concrete takes 2–4 months, which often extends beyond the building season.

Prefab vs. in-situ cast →

How long is the effective Greenlandic building season?

The effective building season in Greenland is typically 4–5 months (May–September). Low temperatures, snowfall and short daylight limit in-situ cast and wet construction outside the season. With CemPU's dry installation without mortar, the building envelope can be closed before winter so interior trades can continue.

Installation in cold weather →

How is CemPU transported to Greenland?

Elements are packed at the factory in Ringe in 40-foot sea containers — typically 100–150 m² of wall per container — and shipped via Aalborg or Aarhus with Royal Arctic Line. Delivery time to Nuuk is 2–4 weeks; coastal towns add an additional 1–2 weeks transit time with coastal vessels.

Logistics to Greenland →

Can CemPU be installed in cold weather?

Yes. CemPU has dry installation without mortar or in-situ cast concrete — temperature is not a limiting factor. The PU core is diffusion-tight and non-hygroscopic and does not absorb moisture. At very low temperatures or strong winds installation can be paused, but the material and joints themselves are not affected.

Installation in cold weather →
04 · Energy & economics

Energy & economics

Operating savings in settlements with expensive heating oil and total economy in Greenlandic context.

How many m² of wall is installed per day in Greenland?

An experienced installation crew typically installs 80–150 m² of wall per day. On Greenlandic construction sites with weather variations and logistics constraints, typically 60–120 m²/day is more realistic. The standard 1200 mm module width and element height up to 3.6 m mean that few elements cover large surfaces.

Read more →

How much can be saved on operating costs in Greenland?

In settlements with expensive heating oil and high electricity tariffs, every tenth of a W/m²K is worth more than in Denmark. At U-value 0.079 vs. typically 0.15-0.20 in traditional construction, 50-60% of heat loss is saved. For a 200 m² home in Nuuk, this can mean 15,000-25,000 DKK/year in saved heating at current prices.

U-value & operating economics →

What does shipping of CemPU to Greenland cost?

Shipping via Royal Arctic Line depends on number of containers and destination. A 40-foot container with 100-150 m² of wall typically costs 35,000-55,000 DKK from Aalborg/Aarhus to Nuuk. Container packing at the factory means only one delivery stop, which significantly reduces logistics complexity.

Logistics & shipping →

What is the total economy compared to traditional construction in Greenland?

TCO over 50 years for Greenlandic projects: CemPU has 5-15% higher material cost but 40-60% lower labour cost (fewer skilled workers and shorter build time), 50-60% lower operating costs (low U-value in settlements) and better risk profile. Result: 15-25% lower TCO in Greenlandic context.

CemPU vs. PIR/PUR →
05 · Applications in Greenland

Applications in Greenland

Which building categories CemPU fits in the Greenlandic market.

Can CemPU be used for multi-storey housing and institutions in Greenland?

Yes. A2-s1,d0 fire class is the key differentiator. PIR/PUR panels (B/C class) are typically refused by Greenlandic authorities for multi-storey housing, institutions and industrial halls. CemPU is documented for exactly these building types — where the need is greatest in Greenland.

A2 opens the doors →

Can CemPU be used for single-family houses in settlements?

Yes. CemPU is ideal for single-family houses in settlements due to low energy consumption, fast installation with a small qualified team and container delivery to coastal towns. The inorganic surface withstands arctic weather conditions and requires minimal maintenance over the lifetime.

See projects →

Can CemPU be used for industrial halls and warehouses?

Yes. CemPU is particularly well suited to industrial halls due to A2 fire class (no combustible insulation, lower fire and insurance requirements), large free spans without internal load-bearing walls, and fixed completion date in short building season. In certain zones the requirement for sprinkler systems is removed due to the A2 class.

Building categories →

Which building categories typically cover Greenlandic projects?

Tekment delivers to six main categories in Greenland: single-family houses in settlements (80-180 m²), social and multi-storey housing (12-60 apartments), institutions (schools, day-care, care homes 400-2,000 m²), commercial and warehouse (600-2,500 m²), envelope renovation (100-800 m²) and pipeline projects under early dialogue.

See projects →
06 · Compliance & BR2006

Compliance & BR2006

CE marking, acoustics and fire strategy under the Building Regulation for Greenland.

What acoustic documentation is delivered?

R'w 42–48 dB depending on build-up and joints. For residential separations and institutional applications, recommended build-ups are delivered that meet BR2006's acoustic requirements. Double-wall constructions and floor solutions are documented per project — particularly important for schools and care homes.

See documentation →

Is CemPU CE marked and recognised under BR2006?

Yes. CemPU is documented under EN 14509 (self-supporting sandwich panels with insulation core) and is supplied with a Declaration of Performance (DoP) and ETA basis. CE marking is recognised under BR2006 in Greenland as documentation of essential properties — fire, mechanical resistance, energy and moisture engineering.

CE and documentation →

How is fire strategy resolved for institutions under BR2006?

Fire strategy for institutions and multi-storey housing is delivered per project — coordinated with the project's fire engineer or consultant. Compartmentation, escape routes and surface spread are addressed in the project-specific fire strategy. CemPU's A2 classification often simplifies the strategy because the facade does not contribute to the fire load.

A2 fire class →

Are there Greenlandic reference projects?

Tekment is currently in early dialogue with consultants, contractors and developers in Greenland about several specific projects — from single-family houses in settlements to institutional construction in Nuuk. Specific reference projects will be added to our site as they are completed. Existing Danish references (housing and commercial) are transferable.

Pipeline projects →
07 · Practical

Practical

Delivery time, quote and factory visit.

How long is the delivery time to Greenland?

Total delivery time from order to arrival on site is typically 8–12 weeks: production 4-6 weeks, preparation and container packing 1-2 weeks, shipping via Royal Arctic Line 2-4 weeks. We recommend dialogue 6-9 months before the building season to secure factory slot and shipping windows.

Logistics & planning →

How do I get a quote for a Greenlandic project?

Send drawings and project description via the contact form. We assess the project and respond within 1–2 working days with a concrete reply — element subdivision, BR2006 documentation needs, container quantity, shipping and installation schedule adapted to the Greenlandic building season.

Submit project →

What documentation should I send from the start?

Plan, section and facade are typically enough for the first assessment. If you also have zone-specific loads (snow load, wind load), energy frame, fire strategy or specific BR2006 requirements from the municipality, even better. We accept everything from hand-drawn sketches to IFC models — we work with what you have.

Contact for dialogue →

Can I visit the factory in Ringe?

Yes. We welcome architects, consulting engineers, contractors and developers from Greenland at the factory in Ringe on Funen. A factory visit gives insight into CNC production, quality control and typical details. Arrange a visit via the contact form — preferably in connection with meetings in Copenhagen or Aarhus.

Arrange factory visit →

Missing an answer to a question not listed here?

Send your question or project description — we respond with a concrete technical assessment within 1–2 working days.