Prefab cement/PU building system · Greenland

Thermal-bridge-free facade elements for arctic construction — BR2006-documented.

CemPU is prefabricated cement/PU sandwich elements that combine load-bearing, insulation and building envelope in one. Fire class A2-s1,d0 opens the doors to multi-storey housing, institutions, commercial and industrial halls — delivered in containers via Royal Arctic Line, installed in the short arctic building season.

0.079 W/m²K U-value at 300 mm
A2-s1,d0 EN 13501-1 Fire class — multi-storey & institution
-40 °C design temp. Arctic climate handled
100–150 m² per container Royal Arctic Line
Relevant for
Why CemPU in Greenland

Four properties that change project economics in arctic climate

Industrial prefab delivers measurable results — not craftsmanship that has to come together on a building site with a 4–5 month season, complex logistics and limited skilled labour.

λ

Low energy use in settlements

Slim walls with U-value down to 0.079 W/m²K. Meets BR2006's tightened requirements for the building envelope — decisive operating economics in settlements with expensive heating oil and high electricity tariffs.

🔥

A2 opens the doors

Fire class A2-s1,d0 (EN 13501-1) approves CemPU for multi-storey housing, institutions, commercial buildings and industrial halls — not just single-family houses to which typical steel panels with PIR/PUR foam (B/C class) are limited.

📦

Container delivery

100–150 m² of wall per 40-foot sea container. Packed at the factory in Ringe and shipped via Aalborg/Aarhus with Royal Arctic Line to Nuuk and coastal towns. Fewer links, less transport damage, better installation window.

⏱

Closed before winter

Large prefab elements, dry installation and fewer work stages. The building envelope is closed in days rather than months — critical with a 4–5 month building season (May–September).

The building system

Three layers. One element. One solution for arctic climate.

CemPU is a prefabricated sandwich element based on the SIP principle — developed further for arctic conditions. Load-bearing, insulation and surface combined in one module at the factory, so quality doesn't depend on the weather on a Greenlandic building site.

The result is a wall with precise joints, no thermal bridges in the construction and documented properties for strength, fire (A2-s1,d0), energy and freeze-thaw — tested under CEN/TS 12390-9.

See the building system in detail
Exterior cement board Inorganic, moisture-resistant building envelope. Withstands arctic weather, freeze-thaw cycles and UV. Ready for plastered solutions or ventilated facade.
PU insulation core High-performance polyurethane with λ = 0.023 W/mK. Diffusion-tight and non-hygroscopic — no risk of condensation at -40 °C design temperature.
Interior cement board Load-bearing skin ready for interior surface treatment. Solid cement surface — no nutrition for mould in humid indoor climate.
Project types

Building types where CemPU fits

A2 fire classification, short installation time and container logistics make CemPU particularly relevant for three project types in Greenland.

Multi-storey housing

Multi-storey · Nuuk & larger cities

A2-s1,d0 fire class · BR2006-documented · container-packed

A2fire class
0.079U-value
Institutions

Schools & institutions · coastal towns

Day-care, school, care home · BR2006 fire & acoustics

42–48dB R'w
-40 °Cdesign temp.
Settlement housing

Single-family & terraced houses · settlements

Low operating consumption · container delivery · small installation team

100–150m² per container
Daysto closed shell
See projects & references
Compliance

Building Regulation for Greenland (BR2006) — how CemPU supports the requirements

BR2006 is set by Naalakkersuisut and imposes stricter requirements for energy frame, snow load, wind load, fire and moisture engineering adapted to arctic climate. CemPU is supplied with documentation that directly addresses the relevant sections.

λ

Energy & U-value

Documented U-value down to 0.079 W/m²K. Comfortably below BR2006's tightened requirements — critical operating economics in settlements with expensive heating oil.

❄

Snow load & wind load

Dimensioned per project according to zone-specific loads: snow load 2.5–4.0 kN/m² and wind speeds up to 55+ m/s. Structural design to EN 1991, stamped documentation.

💧

Moisture & freeze-thaw

The PU core is diffusion-tight and non-hygroscopic; the cement skin tested under CEN/TS 12390-9. Withstands temperature gradients between indoor climate and -40 °C without condensation.

🔥

Fire & acoustics

Classified A2-s1,d0 (limited contribution to fire) and meets acoustic requirements for housing and institutions (R'w 42–48 dB). Full documentation on the documentation page.

Comparison

CemPU vs. PIR/PUR panels vs. traditional masonry

Direct comparison on the parameters that determine project viability in Greenland: fire, U-value, installation time and logistics.

Parameter CemPU Steel panels w. PIR/PUR Traditional masonry / in-situ cast
Fire class (EN 13501-1) A2-s1,d0 — multi-storey/institution OK B/C — typically refused for multi-storey/institution A1/A2 — depends on build-up
U-value (typical wall) 0.079 W/m²K (300 mm) 0.11–0.15 W/m²K 0.15–0.25 W/m²K
Snow load 2.5–4.0 kN/m² Dimensioned per project Limited span OK with framing
Freeze-thaw resistance Tested under CEN/TS 12390-9 Corrosion risk at bends/damage Mortar requires +5 °C, vulnerable
Container delivery 100–150 m² of wall per 40' container Long panels — require flat-rack Many separate deliveries
Installation time (envelope) Days to a few weeks Weeks Months — weather- and drying-dependent
Local labour Small qualified team Small installation team Masons, concrete workers, insulators
In Greenland, it's not bricks that determine the schedule — it's the weather, the shipping plan and the fire class. CemPU brings the three together in one element: A2-approved for multi-storey and institution, container-packed for Royal Arctic Line, and closed building envelope before winter.
Tekment Adapted for arctic construction · BR2006-documented
A2
fire class
multi-storey & institution
Technical knowledge

How CemPU works in the Greenlandic context

Articles on the technical and logistical questions clients and consultants ask most — from fire classification and BR2006 comparison to installation in cold weather.

See all knowledge articles

Do you have a specific project in Greenland?

Send us drawings and a brief project description. We will assess element division, BR2006 documentation needs, container quantity and installation schedule — without obligation.