In a nutshell
- Extension: CemPU can be added to existing buildings — typically as residential expansion or institutional extension
- Facade renovation: Existing envelope can be replaced with CemPU without removing load-bearing construction
- Energy renovation: New CemPU panels on the exterior reduce U-value from 0.4–0.5 to 0.12–0.15
- Internal remodel: CemPU is used for partition walls that increase sound insulation without loading the existing foundation
- Preservation: Existing building substance is preserved — only the envelope is improved
What types of renovation can CemPU be part of?
Four scenarios where CemPU enters existing settlement construction:
1. Extension to existing house: When a family grows or an institution must be expanded, CemPU can be installed as a new wing on the existing building. Dry assembly fits the short building season well.
2. Energy renovation with external insulation: Existing facade is clad with CemPU on the outside. The existing construction remains intact internally, but U-value typically improves from 0.4–0.5 W/m²K to 0.12–0.15 W/m²K.
3. Total facade replacement: Existing envelope is removed (load-bearing construction preserved), and CemPU is installed as new external wall. Used when rot damage or moisture has rendered the original facade unserviceable.
4. Internal remodel: CemPU partition walls are used to redistribute internal program — e.g. adding children's rooms, upgrading bathroom, or creating acoustic separation.
How is CemPU adapted to existing foundations?
Adaptation to existing foundation is typically the hardest part of renovation. Three approaches depending on condition:
1. Foundation in good condition: CemPU panel bottom profile is adapted directly to existing foundation edge. Tekment delivers project-specific profiles to 5–10 mm tolerance.
2. Foundation with minor settling: Use of adjustable installation brackets that absorb differentials of 10–25 mm. We have developed special settlement brackets with horizontal + vertical adjustment.
3. Foundation with larger damage: Local foundation repair or extension combined with CemPU. Typically in collaboration with local geotechnical advisors.
In all three cases, a building survey is performed first so panels can be dimensioned at the factory. This reduces site work to installation and joint sealing.
How big an energy saving is achieved by facade renovation?
A typical Greenlandic timber house from 1970–80s has U-value 0.4–0.5 W/m²K after many years of degraded insulation and vapour barrier. With facade renovation using 200 mm CemPU panel externally, U-value comes down to 0.12–0.15 W/m²K — typically 60–75% reduction in transmission loss.
Concrete example for a 130 m² settlement house in a settlement with heating oil at DKK 15/litre:
- Before renovation: 4,500 litres oil/year = DKK 67,500/year
- After CemPU renovation: 1,500 litres oil/year = DKK 22,500/year
- Annual saving: DKK 45,000
Renovation cost typically DKK 600,000–900,000 for facade alone. Payback time: 14–20 years. Alternatively: demolition and rebuild can cost DKK 2.5–3.5 million and gives the same U-value result — facade renovation is typically 3–4 times cheaper overall.
What logistics advantages does CemPU offer for settlement renovation?
Renovation in settlements has special logistics challenges: all material must be shipped in, stored locally, and installed by often few craftsmen in short time. CemPU's logistics advantages:
1. Container packing: 100–150 m² wall per 40 ft container — typically half of what traditional renovation material requires in shipping units.
2. Dry assembly: No mortar mixing or curing times on site — critical in settlements without local qualifications.
3. CNC precision: Panels are dimensionally exact from the factory, so fitting problems on site are minimised.
4. Reduced craftsman need: 2 fitters can handle an entire facade renovation project — vs. 5–8 craftsmen in traditional renovation.
For settlements without local craftsman capacity, this means the difference between "can be performed" and "cannot be performed".
What renovation projects has Tekment delivered?
Tekment has carried out renovation projects in Greenlandic settlements from 2020 onwards. Typical projects:
1. School renovations: Settlement school in Tasiilaq received facade renovation with CemPU 200 mm in 2024. U-value improved from 0.42 to 0.11. Energy saving 70%.
2. Residential renovations: 6 dwellings in Sisimiut received facade renovation 2023–2025. U-value improved from 0.38 to 0.12. Operating saving DKK 35,000/year/dwelling.
3. Extensions: 4 extensions to existing settlement houses in Aasiaat 2022–2025. Typically 30–60 m² expansion.
4. Institutional renovations: Health centre in Qaqortoq received internal remodel with CemPU partition walls to create treatment rooms with good acoustics (R'w 55+ dB).
All projects carried out with full BR2006 documentation and coordinated with local craftsmen in the settlements.
Frequently asked questions
Can CemPU be used for renovation of existing settlement houses?
Yes. CemPU can integrate as extension, facade renovation with external insulation, total facade replacement, or internal remodel.
How big an energy saving does CemPU facade renovation achieve?
Typically 60–75% reduction in transmission loss — from U-value 0.4–0.5 W/m²K to 0.12–0.15 W/m²K. Annual saving DKK 30,000–50,000 on a 130 m² house.
What is the payback time for facade renovation?
Typically 14–20 years depending on energy price and original U-value. Overall 3–4 times cheaper than demolition + rebuild.
How many craftsmen does CemPU renovation require?
Typically 2 fitters for facade renovation vs. 5–8 craftsmen in traditional renovation. Critical for settlements without local craftsman capacity.
What renovation types are typical?
Extension, facade renovation, total facade replacement, and internal remodel. Tekment has carried out projects in Tasiilaq, Sisimiut, Aasiaat and Qaqortoq from 2020.