Moisture protection in arctic climate — vapour barrier, condensation and mould

With internal temperature at +20 °C and external at -30 °C, the vapour pressure difference through the wall is extreme. A millimetre crack in the vapour barrier can yield litres of condensation in the insulation per day. How CemPU solves the problem without a traditional vapour barrier.

In a nutshell

  • Temperature difference: 50 K between inside (+20 °C) and outside (-30 °C) creates extreme vapour pressure difference
  • Vapour barrier critical: A punctured vapour barrier yields litres of condensation per day in the insulation
  • CemPU's PU core: Closed-cell, diffusion-tight — functions as vapour barrier in the panel itself
  • Cement surfaces: Inorganic, no nutrient for mould — even if moisture should penetrate
  • Joints are the weakness: Tekment's standard detail ensures diffusion-tight interface between panels

How does condensation form in arctic walls?

Water vapour diffuses from warm to cold side through a wall. The pressure difference between inside and outside in Greenland (typically +20 °C inside, -25 to -40 °C outside) is extreme — water pressure inside can be 50–100 times higher than outside. When the vapour meets a cold surface in the construction (typically just inside cold insulation or a cold metal bridge), it condenses. Result: wet insulation that loses 50–80% of its insulation capacity, and over time mould growth in organic materials (timber, cellulose). Traditional Greenlandic construction addresses this with a plastic film vapour barrier on the inside — but only if it is 100% intact.

Why is the vapour barrier so hard to get right?

The vapour barrier must be intact across the entire envelope area — including in installation runs (electrical conduits, ventilation, water pipes), around windows/doors, and where walls meet ceiling and floor. In practice, craftsmen often break the barrier during installation without it being noticed. Three typical weaknesses:
1. Penetrations: Screws, nails, junction boxes — every hole lets vapour through.
2. Missing overlap: The barrier must overlap at least 100 mm and be taped — often this doesn't happen at corners.
3. Ageing: Plastic degrades over 20–30 years from UV and moisture — the vapour barrier becomes permeable before the building is at half its lifetime.
In arctic climate, every error means significant condensation risk.

How does CemPU eliminate the vapour barrier problem?

CemPU sandwich panel has polyurethane core that is closed-cell and diffusion-tight. I.e. the PU foam itself functions as vapour barrier — there is no need for a separate plastic film inside. This delivers four advantages:
1. No craftsman errors: Diffusion-tightness is built in at the factory, not dependent on site assembly.
2. No ageing: Closed-cell PU retains its properties throughout the building's lifetime (50+ years documented).
3. No punctures: The internal surface is solid cement, not a perforable plastic film. Even if you drill into the wall, you don't lose the vapour barrier.
4. Cement = no nutrient: If moisture against expectation should penetrate via a joint, the cement surfaces have no organic content for mould to grow on.

Where are the weaknesses in CemPU moisture protection?

The weakness is the joints — where two panels meet. If the joint is not correctly executed, vapour can pass between panels. Tekment's standard detail handles this with three layers:
1. PUR foam or acrylic sealant in the internal joint — primary vapour-tight barrier.
2. Self-adhesive butyl tape across the joint internally — secondary barrier.
3. Wind-tight tape externally — ensures any moisture that does pass through can dry out.
Joints are pressure-tested to class A on a 1,500 m² test building. Joints at windows and doors are handled with project-specific details in the drawing set.

What if the building still gets moisture problems?

In 99% of cases, moisture problems in CemPU construction do not originate from the envelope but from installation errors: leaking pipes, inadequate ventilation, or moist carpets/furniture standing close to a cold wall. Tekment's troubleshooting procedure:
1. Measure: RH meter and IR camera identify where moisture accumulates.
2. Assess source: Is it installation, ventilation, or envelope?
3. If envelope: Pressure testing locates the leak — typically a joint or penetration.
4. Repair: CemPU's solid cement surface can be drilled, milled, and repaired without losing vapour-tightness — fundamentally different from gypsum-based construction.
We offer moisture inspection and report as part of the warranty package.

Frequently asked questions

Do you need a separate vapour barrier on CemPU?

No. CemPU's closed-cell PU core itself functions as a diffusion-tight vapour barrier. There is no need for plastic film inside.

Can mould develop in CemPU?

Not in the panels themselves — the cement surfaces are inorganic and provide no nutrient for mould. Risk exists only at leaking joints with organic furnishings nearby.

How big is the condensation risk in Greenland?

Extreme if the vapour barrier is not intact — temperature difference of 50 K creates a vapour pressure difference 50–100 times higher than in Danish climate.

How are joints between panels handled?

Three-layer detail: PUR/acrylic sealant + butyl tape internally + wind-tight tape externally. Pressure-tested to class A on a 1,500 m² test building.

How long is the PU core's lifetime?

At least 50 years documented. Closed-cell PU retains its insulation properties and diffusion-tightness without noticeable degradation, as it is protected within the cement skins.