In a nutshell
- Settlement prices: Heat costs DKK 3–5/kWh in settlements vs. DKK 1.5–2.5/kWh in Denmark — three times as high
- Heating oil: Primary heat source in 80% of settlements — shipped in once a year, stored locally in tank facilities
- Electricity production: Diesel generators in settlements without hydropower — electricity price often DKK 4–6/kWh
- District heating: Only in Nuuk, Sisimiut and Ilulissat — other towns/settlements have individual oil boilers or heat pumps
- U-value effect: Half the U-value typically saves DKK 8,000–15,000/year for a 150 m² house
How high is the energy price in Greenlandic settlements?
Settlement energy prices 2026 (averages):
- Nuuk: DKK 2.5–3.5/kWh heat (district heating from oil-fired CHP plant)
- Sisimiut/Ilulissat: DKK 2.8–3.8/kWh heat (partly hydropower + district heating)
- Smaller towns (Aasiaat, Maniitsoq, Qaqortoq): DKK 3.2–4.5/kWh heat
- Settlements without district heating: DKK 4.0–5.5/kWh heat (individual oil heating)
- Electricity in settlements: DKK 4.0–6.0/kWh (diesel generators)
For comparison: a Danish home pays DKK 1.5–2.5/kWh heat depending on source. Energy therefore makes up a disproportionately large share of the settlement household's budget.
Where does the energy come from in different settlements?
Nuuk: Buksefjord hydropower plant supplies about 95% of electricity. District heating is produced at Nuuk CHP plant from heating oil and waste heat.
Sisimiut and Ilulissat: Tasersiaq and Qorlortorsuaq hydropower plants supply most electricity. District heating is supplemented with oil-fired production.
Other larger towns: Diesel generators + district heating from oil-fired CHP.
Smaller settlements: Diesel generator for electricity (typically 50–500 kW), individual oil heating. Oil is shipped in once a year by Royal Arctic Line and stored in municipal tank facilities.
Greenland's hydropower potential is large but only utilised at about 20% — primarily due to logistics and capital costs of new plants.
How big is the gap between oil prices in Denmark and Greenland?
Heating oil in Greenlandic settlements typically costs DKK 12–18/litre (2026), vs. DKK 10–14/litre in Denmark. Logistics (freight, storage, distribution) add DKK 3–6/litre to the original refinery price. If supply problems arise (ice obstruction, late sailing, stock shortage), the price can rise an additional 20–40%. For a 150 m² house with traditional U-value 0.15 W/m²K, annual oil consumption is typically 2,500–4,000 litres — or DKK 30,000–72,000/year just for heating. That is over 10% of an average Greenlandic household income.
How much does CemPU reduce settlement energy consumption?
CemPU 336 mm has U-value 0.079 W/m²K vs. traditional Greenlandic construction's 0.15–0.20. The difference in transmission loss is 50–60% — directly saved on the heating bill. Concrete example for a 150 m² house in a settlement with 300 degree days/month:
- Traditional: 2,500–3,500 litres oil/year × DKK 15/litre = DKK 37,500–52,500/year
- CemPU 336: 1,000–1,500 litres oil/year × DKK 15/litre = DKK 15,000–22,500/year
- Saving: DKK 22,500–30,000/year
Over 50 years (with 3% energy price increase) the saving becomes DKK 1.5–2.5 million — markedly more than the building system's initial price premium.
What alternatives exist to oil heating in settlements?
Four primary alternatives are gaining ground in Greenland:
1. Heat pump (air/water): Effective down to -25 °C with modern units. Works well in coastal settlements where air temperature rarely drops deeper.
2. Geothermal heat pump: Stable energy source independent of air temperature, but requires borehole through permafrost — expensive to establish.
3. Solar heat + accumulator: Combined with well-insulated envelope (e.g. CemPU), up to 30–40% of annual consumption can be covered — especially in summer months.
4. Biomass: Wood pellets or waste — requires local production or import with the same logistical challenges as oil.
In all four scenarios, low U-value is the prerequisite for economic operation.
Frequently asked questions
How much does heat cost in a Greenlandic settlement?
Typically DKK 3–5/kWh in settlements without district heating — three times as high as Danish price of DKK 1.5–2.5/kWh.
Where does the energy come from in the settlements?
The majority from heating oil shipped in once a year, plus diesel-generated electricity. District heating exists only in Nuuk, Sisimiut and Ilulissat.
How much can CemPU save on settlement heating costs?
Typically DKK 22,000–30,000/year for a 150 m² house compared with traditional U-value 0.15 W/m²K. Over 50 years it becomes DKK 1.5–2.5 million.
Is there hydropower in Greenland?
Yes — Buksefjord near Nuuk and Tasersiaq/Qorlortorsuaq near Sisimiut/Ilulissat. Hydropower covers about 20% of national energy consumption.
Can heat pumps be used in Greenland?
Yes, modern air-water heat pumps work effectively down to -25 °C — suitable for coastal settlements. Geothermal heat pumps are more expensive to establish due to permafrost.