Structural design per Eurocodes — how CemPU is adapted to arctic loads

Eurocodes (EN 1990–1999) are the European standard for structural design, and they apply in Greenland too — but with markedly higher load values. How CemPU is adapted to BR2006 projects.

In a nutshell

  • EN 1990 basis: The Eurocode system is used in Greenland as in Denmark — only local load values differ
  • EN 1991-1-3 snow load: Greenlandic projects are dimensioned to 2.5–4.5 kN/m² vs. Denmark's 0.9–1.2
  • EN 1991-1-4 wind load: Wind speed up to 55+ m/s in exposed areas vs. Denmark's 24–27 m/s
  • CemPU load capacity: Standard panels documented for arctic loads — project-specific calculation for special conditions
  • Project package: Tekment delivers structural calculations together with drawing set — directly usable in authority review

Which Eurocodes apply in Greenland?

Eurocodes (EN 1990–1999) are the European standard for structural design and apply in Greenland under BR2006:
EN 1990: Basis of structural design — defines safety factors and load combinations
EN 1991: Loads — snow load (1-3), wind load (1-4), thermal loads (1-5), fire loads (1-2)
EN 1992: Concrete design
EN 1993: Steel design — relevant for fixings and load-bearing elements
EN 1995: Timber beams — relevant for ceilings and rafters
In Greenland the Eurocode system is used unchanged, but with project-specific determination of characteristic loads based on local data from DMI Greenland and the Greenlandic building code BR2006.

How high are snow loads in Greenland per EN 1991-1-3?

EN 1991-1-3 sets characteristic snow load on terrain (s_k) as the central starting point. Values vary markedly across Greenland:
South Greenland (Qaqortoq, Narsaq): s_k = 1.5–2.5 kN/m²
West coast (Nuuk, Sisimiut, Aasiaat): s_k = 2.5–3.5 kN/m²
Disko Bay (Ilulissat, Qasigiannguit): s_k = 3.0–4.0 kN/m²
North Greenland (Upernavik, Qaanaaq): s_k = 3.5–4.5 kN/m²
East coast (Tasiilaq, Ittoqqortoormiit): s_k = 2.5–4.0 kN/m²
Inland ice projects: Up to 5.0+ kN/m²
The design snow load on roof (s) further depends on roof shape, exposure, and thermal coefficient — typically 70–90% of s_k for warm roofs. CemPU roof panels are dimensioned project-specifically based on these values.

How high are wind loads in Greenland per EN 1991-1-4?

EN 1991-1-4 starts with a basic wind speed (v_b,0). In Greenland:
Sheltered settlements (inner fjord areas): v_b,0 = 24–28 m/s
Coastal cities (Nuuk, Sisimiut, Aasiaat): v_b,0 = 28–35 m/s
Exposed settlements (Tasiilaq, Kangerlussuaq): v_b,0 = 35–45 m/s
High-mountain areas: v_b,0 = 45–55+ m/s
The characteristic wind speed v_b and thus wind pressure q_b rise with height, exposure, and terrain factor. For a 2-storey house in Tasiilaq (exposed coastal town), design wind pressure is typically 1.8–2.8 kN/m² vs. 0.5–0.8 kN/m² in Denmark. CemPU's standard load capacity on facade is dimensioned for 2.5 kN/m² external wind load — for projects with higher loads, project-specific calculation is performed.

How is CemPU's load capacity documented?

CemPU's load capacity is documented via three parallel methods:
1. Calculation basis: Standard panel load capacity is calculated per EN 1992 with documented cement reinforcement, PU core (closed-cell foam), and concrete state. Calculations are reviewed by structural engineers at COWI and MOE.
2. Laboratory testing: Load capacity testing of full-scale panels carried out at the Danish Technological Institute laboratory. Tests show load capacity typically 30–40% above the calculated characteristic value.
3. In-situ verification: Load testing on completed buildings has confirmed that characteristic load capacity holds under real loads. Wind storm exposure in Tasiilaq 2024 (recorded 52 m/s wind speed) caused no visible damage to CemPU construction.
The documentation pack with structural calculations is delivered as part of the project drawing set — directly usable in the municipality's authority review.

What are CemPU's limits at extreme loads?

Standard CemPU 336 mm has the following characteristic load capacity (documented):
Vertical load (self-weight + live load): 60 kN/m wall width — corresponds to 4 storeys normal residential load
Wind load horizontal: 2.5 kN/m² external + 1.2 kN/m² internal
Snow load on roof: Roof panels dimensioned for 4.0 kN/m² standard, up to 6.0 kN/m² with project-specific calculation
Fire load: REI 30 with standard panel, REI 60 possible with extra boards
For projects exceeding these limits (industrial halls with large spans, buildings over 4 storeys, or extreme wind exposure over 55 m/s), project-specific dimensioning is performed with extra reinforcement, thicker boards, or strengthened joints. Tekment's product development collaborates with MOE and COWI on such special projects.

Frequently asked questions

Are Eurocodes used in Greenland?

Yes. EN 1990–1999 are used in Greenland under BR2006 — only the characteristic load values are higher than in Denmark.

How high are snow loads in Greenland?

Characteristic snow load on terrain (s_k) varies from 1.5 kN/m² in the south to 4.5+ kN/m² in the north — vs. 0.9–1.2 kN/m² in Denmark.

How high are wind loads in Greenland?

Basic wind speed v_b,0 varies from 24 m/s in sheltered settlements to 55+ m/s in high-mountain areas — vs. 24–27 m/s in Denmark.

How is CemPU's load capacity documented?

Calculation basis per EN 1992 + laboratory testing at Danish Technological Institute + in-situ verification. Documentation pack delivered with the drawing set.

What are CemPU's limits?

Standard 336 mm: 60 kN/m vertical, 2.5 kN/m² wind, 4.0 kN/m² snow load on roof. For projects beyond these limits, project-specific dimensioning is performed.

Need professional input on a Greenland project?

Send drawings and a short project description — we assess relevance and documentation requirements per BR2006.

Contact Tekment Greenland