In a nutshell
- Wind noise: Greenland has wind speeds up to 55+ m/s — creates constant low-frequency noise 30–40 dB higher than Denmark
- R'w requirements: BR2006 requires R'w 50 dB between dwellings and 45 dB on external wall — stricter than Danish requirements in settlements
- CemPU standard: Standard panel reaches R'w 42–48 dB — sufficient for residential separation
- Acoustic version: Reinforced CemPU reaches R'w 50–55 dB — required for classrooms and hotels
- Wind noise handling: Additional sound absorption on the facade markedly reduces wind-generated low frequencies
How big is the wind noise load in Greenland?
Wind speeds in Greenlandic settlements can reach 55+ m/s in exposed areas — Tasiilaq, Kangerlussuaq, and high mountain areas. For comparison, "storm" in Denmark is defined as wind speed over 25 m/s. The extreme wind load creates two acoustic problems:
1. Constant background noise: Wind against the facade typically creates 60–75 dB low-frequency noise inside — even with well-constructed envelope. That is louder than normal speech (50–60 dB).
2. Whistling effects: Sharp edges and joints can generate high-frequency whistling at certain wind speeds. Particularly problematic at windows and roof eaves.
This means the envelope's acoustic properties are significantly more important in Greenland than in Denmark.
What acoustic requirements does BR2006 set?
BR2006 sets stricter acoustic requirements for settlements and institutions:
Residential separation:
- R'w between dwellings: ≥50 dB (vs. ≥55 dB in BR18)
- R'w between dwelling and corridor: ≥48 dB
Schools and institutions:
- R'w between classrooms: ≥50 dB
- R'w between classroom and corridor: ≥55 dB
- R'w between classroom and special rooms (music): ≥55 dB
Facade (against external noise):
- R'w 45 dB against normal road noise
- R'w 50 dB in settlements with high wind load or airport (Kangerlussuaq, Ilulissat)
Acoustic absorption inside:
- Classrooms: T_60 <0.6 seconds
- Health treatment rooms: T_60 <0.4 seconds
What is CemPU's R'w value?
CemPU sandwich panel has the following sound insulation, documented by 103 ApS:
Standard CemPU 336 mm: R'w = 42–48 dB (depending on joint details)
Acoustic version (reinforced boards): R'w = 50–52 dB
Double-skin construction (CemPU + 50 mm acoustic insulation + 12.5 mm gypsum): R'w = 55–58 dB
Triple wall (two CemPU panels + acoustic gap): R'w = 60+ dB (used for hotels and special rooms)
The difference between CemPU's acoustic properties and aerated concrete/light expanded clay blocks is marginal at low frequencies, but CemPU performs markedly better against low-frequency wind noise due to the PU core's damping properties. This is documented in an acoustic study from 103 ApS of a CemPU project in Tasiilaq.
How is low-frequency wind noise handled?
Low-frequency wind noise (below 200 Hz) is the hardest to insulate against. Massive inorganic materials like concrete and brick have generally good sound-insulating properties, but CemPU's sandwich construction has a special advantage: the PU core acts as a sound-absorbing "spring" between the two massive cement boards, which dampens low frequencies markedly better than solid construction.
For projects in particularly wind-exposed settlements (Tasiilaq, Kangerlussuaq, Upernavik), we recommend three measures:
1. Standard CemPU panel as primary facade
2. Secondary acoustic absorption internally (perforated gypsum boards behind free-standing panels)
3. Wind-break detailing at corners and roof eaves to remove whistling
Result: internal sound level often 15–20 dB lower than traditional Greenlandic construction at the same wind load.
What acoustic tests has Tekment performed in Greenland?
Tekment has worked with 103 ApS on two types of acoustic studies in Greenland:
1. Laboratory test: Standard panel test per EN ISO 717 at 103 ApS' facility in Brøndby. Result: R'w 43 dB for CemPU 336 mm in standard configuration.
2. In-situ measurement: Measurements in completed projects in Tasiilaq and Sisimiut have confirmed that the laboratory figure holds in the finished building — typically within ±2 dB.
These reports are ready to feed into authority review under BR2006. All CemPU projects to Greenland are delivered with acoustic evidence in the documentation pack.
Frequently asked questions
Why are acoustic requirements stricter in Greenland?
Wind speeds up to 55+ m/s create constant background noise 30–40 dB higher than Denmark. The envelope's acoustic properties therefore become critical.
What is CemPU's sound reduction?
Standard CemPU 336 mm reaches R'w 42–48 dB. The acoustic version reaches 50–52 dB; double-skin construction reaches 55–58 dB.
Does CemPU meet BR2006's requirements for residential separation?
Yes, standard CemPU reaches R'w 42–48 dB (requirement is 50 dB between dwellings). For classrooms, the acoustic version must be used (R'w 50–52 dB).
How is low-frequency wind noise handled?
The PU core in CemPU acts as a sound-absorbing spring between the cement boards — damping low frequencies markedly better than solid construction.
Is there acoustic evidence for CemPU in Greenland?
Yes — laboratory test from 103 ApS plus in-situ measurements in completed projects in Tasiilaq and Sisimiut. All projects are delivered with acoustic evidence.