Complete fire documentation: DBI tests, technical fire notes, corner assessment, electrical embedments, window reveals and assessments of wall fire resistance. For consultants, contractors and authorities working with design and approval.
All reports are prepared by DBI (Danish Institute of Fire and Security Technology) and follow the relevant European and Danish standards. Reports are in Danish; English summaries are available on request.

DBI assessment of the corner solution in the Tekment wall with REI 30 requirement.
Download PDF →
Classification of Tekment as K1 10 cladding over PUR insulation.
Download PDF →
DBI fire test of sockets and window reveals in Tekment wall, REI 30.
Download PDF →
Use of Tekment in relation to BR18 and pre-accepted solutions.
Download PDF →
DBI fire test of the load-bearing Tekment wall per EN 1365-1, REI 30.
Download PDF →
Supplementary DBI assessment with limits for load and wall height.
Download PDF →