Sound reduction (Rw) and recommended build-ups for CemPU panels. The documentation covers housing, office and production buildings, and includes solutions for apartment separation walls with stricter requirements.
The CemPU build-up – two solid cement boards with an insulating PUR core – provides solid sound reduction in its own right. Sound is damped by the mass of the boards, while the PUR core breaks the path of sound through the construction.
For higher acoustic requirements (typically apartment separation between dwellings) CemPU is combined with an acoustic lining, so that the complete separation meets the BR18 requirement for airborne sound insulation.
Indicative values based on standard build-ups. Contact us for project-specific calculations and laboratory measurements.
| Standard external wall (200 mm) | Rw ≈ 42 dB |
|---|---|
| Standard external wall (300 mm) | Rw ≈ 45 dB |
| Internal wall (200 mm) · non-load-bearing | Rw ≈ 42 dB |
| Apartment separation · CemPU + lining | Rw ≥ 55 dB (BR18 requirement) |
| Office separation · CemPU + lining | Rw ≈ 48–52 dB |
| Production building · external wall | Rw ≥ 50 dB (depending on build-up) |
Download the technical acoustic note documenting the sound properties for the CemPU building system. The report is in Danish; English summary available on request.
Drawings and principle sections for an acoustic apartment separation – also available on the details page.