Low energy consumption
Slim walls with U-values down to 0.079 W/m²K. Meets BR18 low-energy requirements without compromising architectural freedom.
CemPU is a prefabricated cement/PU sandwich panel that combines load-bearing capacity, insulation and weather protection in a single module. Developed for low-energy construction – industrial halls, housing and commercial buildings.
Industrial prefabrication delivers measurable, reproducible results – not craftsmanship that has to come together on site.
Slim walls with U-values down to 0.079 W/m²K. Meets BR18 low-energy requirements without compromising architectural freedom.
Cement-based envelope with documented REI 30 fire resistance and verified structural calculations. DBI-tested.
Compared with traditional concrete panels. Reduced material consumption, fewer transports and optimised insulation deliver a lower CO₂ footprint across the entire service life. Documented in our LCA client report (EN 15804+A2).
Large prefabricated panels, dry installation and fewer trades. Weathertight shell typically in 5–11 days.
CemPU is a prefabricated sandwich panel based on the SIP principle – refined for Nordic conditions. Load-bearing, insulation and surface are assembled into a single module in the factory, so quality does not depend on the weather on site.
The result is a wall with precise joints, minimised thermal bridges and documented properties for strength, fire and energy performance.
See the building system in detailSelected references with documented construction data. See all projects for details.

We had a weathertight shell in five days. No wet trades, no drying time, and the U-value delivered exactly what the energy frame promised. It changes the whole schedule for us.